A Unified Tool to Foster Front-End Planning and Sustainability in Infrastructure Projects

被引:0
|
作者
Ferrer, Valentina [1 ]
Pradhananga, Piyush [2 ]
Elzomor, Mohamed [1 ]
机构
[1] Florida Int Univ, Moss Sch Construct Infrastruct & Sustainabil, Miami, FL 33199 USA
[2] Florida Int Univ, Dept Civil & Environm Engn, Miami, FL 33199 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sustainable infrastructure plays a critical role in improving the quality of life for the public, cultivating resilience against extreme weather and recurring disaster events, and ensuring sound economic development. However, to this end, many infrastructure projects fail to meet sustainability goals and are often plagued with schedule delays and cost overruns. This study aims to investigate existing synergies between six key elements from an FEP tool [i.e., Project Definition Rating Index (PDRI)] and 20 Envision credits to develop a reliable matrix that provides correlation and strategies to enhance project performance. To achieve this objective, this research surveyed 109 stakeholders of more than 45 Envision projects, representing more than 60% of the current Envision-certified projects in the US. The obtained data are analyzed using a threshold model and an ordered probit regression model to formulate a conceptual matrix that shows the correlation between Envision and the PDRI.
引用
收藏
页码:376 / 385
页数:10
相关论文
共 50 条
  • [21] Cost escalations in the front-end of projects - empirical evidence from Norwegian road projects
    Welde, Morten
    Odeck, James
    [J]. TRANSPORT REVIEWS, 2017, 37 (05) : 612 - 630
  • [22] Conceptualizing, assessing, and managing front-end fuzziness in innovation/NPD projects
    Chang, Sheng-Li
    Chen, Chih-Yuan
    Wey, Shyh-Chyi
    [J]. R & D MANAGEMENT, 2007, 37 (05) : 469 - 478
  • [23] Analysis of the Front-End Loading of Alberta Mega Oil Sands Projects
    Jergeas, George
    [J]. PROJECT MANAGEMENT JOURNAL, 2008, 39 (04) : 95 - 104
  • [24] Front-end value co-creation in housing development projects
    Candel, Melissa
    Karrbom Gustavsson, Tina
    Eriksson, Per-Erik
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (03) : 245 - 260
  • [25] Low estimates - high stakes: underestimation of costs at the front-end of projects
    Andersen, Bjorn
    Samset, Knut
    Welde, Morten
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2016, 9 (01) : 171 - 193
  • [26] Assessment of early warning signs in hospital projects' front-end phase
    Larsen, Anne Strand Alfredsen
    Karlsen, Anniken Th
    Lund, Jo-Asmund
    Andersen, Bjorn Sorskot
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2022, 15 (02) : 299 - 323
  • [27] Front-End Planning Implementation in Singapore: Status, Importance, and Impact
    Hwang, Bon-Gang
    Ho, Jia Wei
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) : 567 - 573
  • [28] Designing a Visual Tool for Teaching and Learning Front-End Innovation
    John, Priscilla Kan
    Lear, Emmaline
    Decosta, Patrick L'Espoir
    Gregor, Shirley
    Dann, Stephen
    Sun, Ruonan
    [J]. TECHNOLOGY INNOVATION MANAGEMENT REVIEW, 2020, 10 (09): : 16 - 26
  • [29] LOGIC SYNTHESIS AS A FRONT-END TOOL IN AN ASIC DESIGN ENVIRONMENT
    BELL, B
    WOPPMAN, G
    [J]. VLSI SYSTEMS DESIGN, 1988, 9 (12): : S4 - &
  • [30] 'Enhanced front-end loading' aims for assurance in project planning
    Westney, Richard
    Dahl, Justin
    [J]. OIL & GAS JOURNAL, 2019, 117 (06) : 18 - 24