Conceptual Quantitative Model to Group Risks in Fast-Track Construction Projects

被引:0
|
作者
Martins, Claudia Garrido [1 ]
Bogus, Susan M. [1 ]
Valentin, Vanessa [1 ]
机构
[1] 1 Univ New Mexico, Dept Civil Construct & Environm Engn, Univ New Mexico, MSC01 1070, Albuquerque, NM 87131 USA
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Overlapping of activities on fast-track projects generates unique risks which can be grouped using a new quantitative model. The model employs clustering analysis to classify the risks according to the risk categories and activity evolution, sensitivity, production reliability, and constraints. A hierarchical method is first applied using the centroid method and square Euclidean distance to define the number of clusters. Then, we apply a nonhierarchical method using K-means and a convergence criterion of zero to generate the final groups. A base case with data collected through a case study using a commercial construction project illustrates the clustering approach. Results showed that the risks could be combined into ten clusters. Although the results will vary by project, the model can be applied to group risks of any fast-track construction project and support the definition of mitigation actions and allocation of responsibilities.
引用
收藏
页码:507 / 513
页数:7
相关论文
共 50 条
  • [31] Automated fast-track reconfiguration of group communication systems
    Kreitz, C
    [J]. TOOLS AND ALGORITHMS FOR THE CONSTRUCTION AND ANALYSIS OF SYSTEMS, 1999, 1579 : 104 - 118
  • [32] Risk assessment of fast-track projects: a systems-based approach
    Rasul, Nazia
    Malik, Muhammad Sohail Anwar
    Bakhtawar, Beenish
    Thaheem, Muhammad Jamaluddin
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1099 - 1114
  • [33] Managing Fast-Track Construction Project in Qatar: Challenges and Opportunities
    Egbelakin, Temitope
    Ogunmakinde, Olabode Emmanuel
    Teshich, Billie
    Omotayo, Temitope
    [J]. BUILDINGS, 2021, 11 (12)
  • [34] THE DESIGN AND CONSTRUCTION OF A FAST-TRACK CASINO/HOTEL PROJECT IN MACAU
    Lee, David C. S.
    Lee, H. Y.
    Chan, Chester W. M.
    [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 737 - 747
  • [35] FAST-TRACK, LOW-COST CONSTRUCTION STARTS WITH THE OWNER
    SMOCK, R
    [J]. POWER ENGINEERING, 1992, 96 (02) : 19 - 23
  • [36] Fast-track, low-cost construction starts with the owner
    Smock, Robert
    [J]. Power Engineering (Barrington, Illinois), 1992, 96 (02): : 19 - 23
  • [37] Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea
    Cho, KyuMan
    Hyun, ChangTaek
    Koo, KyoJin
    Hong, TaeHoon
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (01) : 19 - 29
  • [38] FAST-TRACK PROJECTS PROVIDE NICHE MARKET FOR CHEMICAL-PLANT BUILDERS
    AINSWORTH, SJ
    [J]. CHEMICAL & ENGINEERING NEWS, 1992, 70 (42) : 11 - 12
  • [39] SELECTING A CONTRACTOR FOR FAST-TRACK PROJECTS .1. PRINCIPLES OF CONTRACTOR EVALUATION
    MOORE, MJ
    [J]. PLANT ENGINEERING, 1985, 39 (12) : 74 - 75
  • [40] Controlling of fast-track construction method variables (time, cost, and quality)
    El-Far, Mohamed Ehab
    Kotb, Mostafa
    Sabry, Reda
    [J]. INFRASTRUCTURE ASSET MANAGEMENT, 2023, 10 (02) : 103 - 112