Managing Fast-Track Construction Project in Qatar: Challenges and Opportunities

被引:4
|
作者
Egbelakin, Temitope [1 ]
Ogunmakinde, Olabode Emmanuel [2 ]
Teshich, Billie [3 ]
Omotayo, Temitope [4 ]
机构
[1] Univ Newcastle, Sch Architecture & Built Environm, Callaghan, NSW 2308, Australia
[2] Bond Univ, Fac Soc & Design, Gold Coast, Qld 4229, Australia
[3] Al Asmakh Real Estate Dev Co, Doha 122104, Qatar
[4] Leeds Beckett Univ, Sch Built Environm Engn & Comp, City Campus, Leeds LS2 8AG, W Yorkshire, England
关键词
barriers; construction; fast-track; project management; Qatar; MANAGEMENT;
D O I
10.3390/buildings11120640
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Fast-track construction projects are becoming increasingly prevalent in the construction industry, particularly where completion time is essential. A high adoption rate in some of the United Arab Emirate countries and the lack of a conceptual understanding of the challenges inherent in such may jeopardize the future sustainability of the construction sector. To make an informed decision about adopting a fast-track construction method, it is necessary to first identify the opportunities and challenges associated with it. Therefore, this study examines the critical challenges impeding the performance of Qatar's fast-track construction projects. The research findings were analysed and triangulated using a real-life project as a case study and several data sources. The results of the research identified four critical categories of barriers: design and coordination-related, scope or change orders-related, material and equipment-related, and contractual-related barriers. In addition, strategies such as accurate information, constructability assessment, early involvement of operations and maintenance personnel, and the use of an effective change control system were identified for addressing the identified challenges. The findings are beneficial to professionals who are currently operating or planning to undertake construction projects in Qatar or other United Arab Emirate countries. This study recommends that project managers be more attentive to key barriers in order to improve the performance of fast-track projects and to meet clients' objectives.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Design challenges for wax in a fast-track deepwater project
    Alwazzan, Amir
    Utgard, Mark
    Barros, Dalmo
    [J]. JPT, Journal of Petroleum Technology, 2009, 61 (06): : 45 - 47
  • [2] THE DESIGN AND CONSTRUCTION OF A FAST-TRACK CASINO/HOTEL PROJECT IN MACAU
    Lee, David C. S.
    Lee, H. Y.
    Chan, Chester W. M.
    [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 737 - 747
  • [3] Documenting fast-track construction
    Brown, Linda
    [J]. Construction Specifier, 2003, 56 (03): : 104 - 106
  • [4] Fast-track hysterectomy: a pilot project
    Ulrich, D.
    Tamussino, K.
    Fruhmann, A.
    Mueller, G.
    Amon, B.
    Schoenett, B.
    Bjelic-Radisic, V
    Bader, A.
    Winter, R.
    [J]. GEBURTSHILFE UND FRAUENHEILKUNDE, 2009, 69 (05) : 478 - 478
  • [5] Challenges of fast-track arthroplasty in Germany
    Noeth, U.
    Rackwitz, L.
    Clarius, M.
    [J]. ORTHOPADE, 2020, 49 (04): : 334 - 337
  • [6] Design impact of construction fast-track
    Fazio, P.
    Moselhi, O.
    Théberge, P.
    Revay, S.
    [J]. Construction Management and Economics, 1988, 6 (03) : 195 - 208
  • [7] Fast-track construction at Mount Polley
    [J]. Min Eng (Littleton Colo), 11 (31):
  • [8] FAST-TRACK METHODS + CONSTRUCTION DOCUMENTATION
    AMOROSO, D
    [J]. PROGRESSIVE ARCHITECTURE, 1989, 70 (12): : 51 - &
  • [9] Fast-track construction for precast concrete
    Jones, Paul
    [J]. Concrete (London), 2003, 37 (11): : 14 - 15
  • [10] Fast-Track International Construction Arbitrations
    Hinchey, John W.
    [J]. CONTEMPORARY ISSUES IN INTERNATIONAL ARBITRATION AND MEDIATION: THE FORDHAM PAPERS 2012, 2014, 6 : 227 - 257