Design challenges for wax in a fast-track deepwater project

被引:0
|
作者
Alwazzan, Amir [1 ]
Utgard, Mark [1 ]
Barros, Dalmo [2 ]
机构
[1] AMEC Paragon, United States
[2] Petrobras America, United States
来源
JPT, Journal of Petroleum Technology | 2009年 / 61卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Journal article (JA)
引用
收藏
页码:45 / 47
相关论文
共 50 条
  • [1] Managing Fast-Track Construction Project in Qatar: Challenges and Opportunities
    Egbelakin, Temitope
    Ogunmakinde, Olabode Emmanuel
    Teshich, Billie
    Omotayo, Temitope
    BUILDINGS, 2021, 11 (12)
  • [2] THE DESIGN AND CONSTRUCTION OF A FAST-TRACK CASINO/HOTEL PROJECT IN MACAU
    Lee, David C. S.
    Lee, H. Y.
    Chan, Chester W. M.
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 737 - 747
  • [3] Fast-track hysterectomy: a pilot project
    Ulrich, D.
    Tamussino, K.
    Fruhmann, A.
    Mueller, G.
    Amon, B.
    Schoenett, B.
    Bjelic-Radisic, V
    Bader, A.
    Winter, R.
    GEBURTSHILFE UND FRAUENHEILKUNDE, 2009, 69 (05) : 478 - 478
  • [4] Challenges of fast-track arthroplasty in Germany
    Noeth, U.
    Rackwitz, L.
    Clarius, M.
    ORTHOPADE, 2020, 49 (04): : 334 - 337
  • [6] Fast-track your pilot plant project
    Martin, P
    Dietrich, MJ
    CHEMICAL ENGINEERING PROGRESS, 2005, 101 (01) : 26 - 31
  • [7] Fast-track project management in the biopharmaceutical industry
    Djurslev, Finn
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 51 - 53
  • [8] Design impact of construction fast-track
    Fazio, P.
    Moselhi, O.
    Théberge, P.
    Revay, S.
    Construction Management and Economics, 1988, 6 (03) : 195 - 208
  • [9] FAST-TRACK DESIGN OF A COMPLEX MOTHERBOARD
    ULRICH, J
    HIGH PERFORMANCE SYSTEMS-THE MAGAZINE FOR TECHNOLOGY CHAMPIONS, 1989, 10 (12): : 79 - &
  • [10] Mediation - A Fast-track Solution to fast-track Problems
    Clifford, W.D.
    2001, Construction Specifications Institute Inc. (54):