Design challenges for wax in a fast-track deepwater project

被引:0
|
作者
Alwazzan, Amir [1 ]
Utgard, Mark [1 ]
Barros, Dalmo [2 ]
机构
[1] AMEC Paragon, United States
[2] Petrobras America, United States
来源
JPT, Journal of Petroleum Technology | 2009年 / 61卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Journal article (JA)
引用
收藏
页码:45 / 47
相关论文
共 50 条
  • [21] Fast-track production project cuts installation time in half
    Vargas, K.J.
    Oil and Gas Journal, 1991, 89 (06): : 58 - 62
  • [22] BOREALIS PROJECT: A FAST-TRACK APPROACH TO MINE DEVELOPMENT.
    Lightner, F.H.
    Faverty, R.L.
    Coughlin, W.E.
    Mining Engineering, 1983, 35 (11): : 1564 - 1565
  • [23] Fast-track surgery
    Rusby, JE
    Welch, CMM
    Lamparelli, MJ
    BRITISH JOURNAL OF SURGERY, 2005, 92 (06) : 783 - 783
  • [24] THE MEDICAL FAST-TRACK
    LYONS, SM
    ANAESTHESIA, 1994, 49 (10) : 841 - 842
  • [25] Fast-track authority
    Weinberger, CW
    FORBES, 1997, 160 (09): : 37 - 37
  • [26] FAST-TRACK IMPLEMENTATION
    不详
    COMPUTER-AIDED ENGINEERING, 1994, 13 (05): : 14 - 14
  • [27] Fast-track moldmaking
    Shafer, S
    MOLDING SYSTEMS, 1999, 57 (10): : 20 - 24
  • [28] Fast-track funding
    Kudelka, B
    CIVIL ENGINEERING, 2000, 70 (04): : 54 - 57
  • [29] Fast-track vision
    Rachel Jones
    Nature Reviews Neuroscience, 2003, 4 : 779 - 779
  • [30] Fast-track to market
    Breinholt, Martin Stener
    Cleanroom Technology, 2020, 28 (02): : 55 - 56