共 50 条
- [33] TECHNICAL, ECONOMIC AND SOCIAL ASPECTS OF PREFABRICATED (MODULAR) WOODEN HOUSE CONSTRUCTION WOOD PROCESSING AND FURNITURE MANUFACTURING CHALLENGES ON THE WORLD MARKET AND WOOD-BASED ENERGY GOES GLOBAL, 2015, : 93 - 100
- [34] Artificial Intelligence and Robotics for Prefabricated and Modular Construction: A Systematic Literature Review Journal of Construction Engineering and Management, 2022, 148 (09):
- [39] No epidemic poliovirus detected in the Cape Verde community of Rotterdam during the poliomyelitis outbreak on Cape Verde in 2000 EUROPEAN JOURNAL OF PUBLIC HEALTH, 2004, 14 (04): : 91 - 92
- [40] Neotectonic morphotructures in the junction zone of the Cape Verde Rise and Cape Verde Abyssal Plain, Central Atlantic Geotectonics, 2009, 43 : 51 - 66