Prefabricated Solution to Modular Construction in Cape Verde

被引:3
|
作者
Vieira, Nuno [1 ]
Amado, Miguel [2 ]
Pinho, Fernando [1 ]
机构
[1] Univ Lisbon, NOVA, Dept Civil Engn, P-2829516 Caparica, Portugal
[2] CERIS, Inst Super Tecn, Dept Civil Engn Architecture & Georesources, Ave Rovisco Pais 1, P-1049001 Lisbon, Portugal
关键词
D O I
10.1063/1.4976290
中图分类号
O59 [应用物理学];
学科分类号
摘要
Nowadays, the lack of adequate housing in Cape Verde is a growing problem. The migration of the population living in the countryside to the major cities generates an increase of the diameter of the cities. With the lack of economic power, the migrating families tend to occupy the land with houses which don't present proper conditions to living. Praia is the capital of Cape Verde and so on the biggest city of the country. This fact leads Praia to being the city with major economic power and job offer in all country. Consequently, Praia has developed the biggest slum of the Cape Verde and it is urgent to approach this problem in order to create solutions that reveal capacity to start solving it. Cape Verde's unique dry subtropical climate turns indispensable a careful resolution of the housing, in order to ensure the comfort of the occupants. The modular construction is a solution with potential to approach this problem with a fast and economic response. In order to answer the situation, this article introduces a modular solution in order to reach the needing of thermal comfort to the specific case of Praia.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Brazilian Zika in Cape Verde
    不详
    SCIENCE, 2016, 352 (6289) : 1037 - 1037
  • [22] Progress of The Cape Verde Flora
    Diniz, MA
    Gomes, I
    Paiva, J
    Moreira, I
    BIODIVERSITY OF AFRICAN PLANTS, 1996, : 783 - 784
  • [23] THE CAPE-VERDE ISLANDS
    FYFE, C
    HISTORY TODAY, 1981, 31 (MAY) : 5 - 9
  • [24] PESTS OF CAPE VERDE ISLANDS
    SCHMUTTERER, H
    PIRES, A
    KOCH, CK
    ZEITSCHRIFT FUR ANGEWANDTE ENTOMOLOGIE-JOURNAL OF APPLIED ENTOMOLOGY, 1978, 86 (03): : 320 - 336
  • [25] On the avifauna of the Cape Verde Islands
    Murphy, RC
    SCIENCE, 1924, 60 : 94 - 95
  • [26] MOSSES OF CAPE VERDE ISLANDS
    BIZOT, M
    DURY, MN
    NORWEGIAN JOURNAL OF BOTANY, 1978, 25 (04): : 249 - 253
  • [27] Artificial Intelligence and Robotics for Prefabricated and Modular Construction: A Systematic Literature Review
    Pan, Mi
    Yang, Yi
    Zheng, Zhenjie
    Pan, Wei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (09)
  • [28] Rainfall erosivity in Cape Verde
    Mannaerts, CM
    Gabriels, D
    SOIL & TILLAGE RESEARCH, 2000, 55 (3-4): : 207 - 212
  • [29] Shear behavior of the fully prefabricated liftable connection for modular steel construction
    Deng, En-Feng
    Du, You-Peng
    Lian, Jun-Yi
    Zhang, Zhe
    Qian, Hui
    Zhang, Jun-Feng
    Liu, Chang-Zhen
    JOURNAL OF BUILDING ENGINEERING, 2024, 92
  • [30] Cape verde: The top LDC
    Gray, Vanessa
    Minge, Michael
    ITU News, 2003, (04): : 21 - 24