Prefabricated Solution to Modular Construction in Cape Verde

被引:3
|
作者
Vieira, Nuno [1 ]
Amado, Miguel [2 ]
Pinho, Fernando [1 ]
机构
[1] Univ Lisbon, NOVA, Dept Civil Engn, P-2829516 Caparica, Portugal
[2] CERIS, Inst Super Tecn, Dept Civil Engn Architecture & Georesources, Ave Rovisco Pais 1, P-1049001 Lisbon, Portugal
关键词
D O I
10.1063/1.4976290
中图分类号
O59 [应用物理学];
学科分类号
摘要
Nowadays, the lack of adequate housing in Cape Verde is a growing problem. The migration of the population living in the countryside to the major cities generates an increase of the diameter of the cities. With the lack of economic power, the migrating families tend to occupy the land with houses which don't present proper conditions to living. Praia is the capital of Cape Verde and so on the biggest city of the country. This fact leads Praia to being the city with major economic power and job offer in all country. Consequently, Praia has developed the biggest slum of the Cape Verde and it is urgent to approach this problem in order to create solutions that reveal capacity to start solving it. Cape Verde's unique dry subtropical climate turns indispensable a careful resolution of the housing, in order to ensure the comfort of the occupants. The modular construction is a solution with potential to approach this problem with a fast and economic response. In order to answer the situation, this article introduces a modular solution in order to reach the needing of thermal comfort to the specific case of Praia.
引用
下载
收藏
页数:9
相关论文
共 50 条
  • [1] Health and Safety on Construction Sites in Cape Verde
    Palhinha, Paulo
    SHO2016: INTERNATIONAL SYMPOSIUM ON OCCUPATIONAL SAFETY AND HYGIENE, 2016, : 239 - 241
  • [2] Modular Construction with Prefabricated Concrete Parts
    不详
    BAUINGENIEUR, 2016, 91 : A25 - A25
  • [3] Construction of a sustainable island city: The case of Cape Verde
    Cruz, Rui Vera
    Amado, Miguel P.
    INTERNATIONAL CONFERENCE ON TECHNOLOGIES AND MATERIALS FOR RENEWABLE ENERGY, ENVIRONMENT AND SUSTAINABILITY -TMREES15, 2015, 74 : 1476 - 1489
  • [4] Optimization of Prefabricated Components in Housing Modular Construction
    Nam, Sunghoon
    Yoon, Jongsik
    Kim, Kyungrai
    Choi, Byungjoo
    SUSTAINABILITY, 2020, 12 (24) : 1 - 22
  • [5] Cape Verde
    Bergt
    PETERMANNS MITTEILUNGEN, 1914, 60 : 49 - 49
  • [6] The Promotion of Health and Safety at Work in the Construction Companies of Cape Verde
    Palhinha, Paulo
    INTERNATIONAL JOURNAL ON WORKING CONDITIONS, 2015, (10): : 152 - 167
  • [7] Safety concerns related to modular/prefabricated building construction
    Fard, Maryam Mirhadi
    Terouhid, Seyyed Amin
    Kibert, Charles J.
    Hakim, Hamed
    INTERNATIONAL JOURNAL OF INJURY CONTROL AND SAFETY PROMOTION, 2017, 24 (01) : 10 - 23
  • [9] ESTIMATES OF CONSTRUCTION INFRASTRUCTURE STOCK FOR CAPE VERDE: 1980-2019
    Lopes, Jorge
    Tavares, Admir
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2024, 30 (04) : 295 - 306
  • [10] REPUBLIC OF CAPE VERDE
    Tengho, Serge Marcellin
    AFRICAN DISABILITY RIGHTS YEARBOOK, 2022, 10 : 168 - 186