Research on Thermal Power Plant Construction Project Risk Evaluation Based on AHP and Gray Relational analysis

被引:0
|
作者
Li Jianqing [1 ]
Niu Dongxiao [1 ]
机构
[1] N China Elect Power Univ, Sch Business Management, Beijing 102206, Peoples R China
关键词
gray relational analysis; AHP; thermal power construction project; risk evaluation;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Heat and power cogeneration is a mode of production that steam with high-quality made from turbine-generator units is used to generate electricity and steam with low-quality is used to support heat. Thermal power plant can produce heat for central provided heating and also generate electricity to produce power. Thermal power plant construction project risk management means the uncertain influence on construction project goals and production operation management throughout the life cycle which could cause the losses made by uncertain events. In this paper, we combine the theory of the whole life cycle with AMP and gray relational analysis to determine the risk factors and the size of each risk. The whole life cycle is divided into four stages: the available research and planning, design, construction, and operation. Here we set an example of Bao Ding thermal power plant to analyze the risk management and provide some available measurements to tell us how to deal with the risks.
引用
收藏
页码:62 / 65
页数:4
相关论文
共 50 条
  • [1] The Research of Risk Evaluation of Agent Construction Project Based on Group AHP
    Wang Ailing
    Sun Shaonan
    Feng Xiaoling
    [J]. PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 462 - 466
  • [2] The Construction Project Bid Evaluation Based on Gray Relational Model
    Yan Hong-yan
    [J]. CEIS 2011, 2011, 15
  • [3] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [4] Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method
    Zhao, Huiru
    Guo, Sen
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [5] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [6] Evaluation Research of the Thermal Power Engineering Project Construction Risk Based on Fuzzy Analytic Hierarchy Process
    Zhao, Jian-Na
    Liu, Fei-Fan
    [J]. INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING AND MECHANICAL AUTOMATION (ICEEMA 2015), 2015, : 375 - 379
  • [7] Evaluation of Safety Risk in ATM Based on the Gray Relational Analysis
    Chen, Yaqing
    Li, Shigang
    Lu, Guoyi
    [J]. ADVANCED RESEARCH ON MECHANICAL ENGINEERING, INDUSTRY AND MANUFACTURING ENGINEERING, PTS 1 AND 2, 2011, 63-64 : 755 - +
  • [8] Risk Management Evaluation Based on Elman Neural Network for Power Plant Construction Project
    Wang, Yongli
    Niu, Dongxiao
    Xing, Mian
    [J]. ADVANCES IN INTELLIGENT INFORMATION AND DATABASE SYSTEMS, 2010, 283 : 315 - +
  • [9] Research on Evaluation of Power Enterprise Safety Management Capability Based on Gray AHP
    Zhao, Yi-Ming
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING AND INDUSTRIAL INFORMATICS (AMEII 2016), 2016, 73 : 1450 - 1454
  • [10] The Analysis and Application of AHP in a Construction Project Evaluation
    Li, Debin
    Yao, Yong
    Han, Meng
    [J]. TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 3740 - 3744