The Research of Risk Evaluation of Agent Construction Project Based on Group AHP

被引:0
|
作者
Wang Ailing [1 ]
Sun Shaonan
Feng Xiaoling [1 ]
机构
[1] Zhengzhou Univ, Sch Management Engn, Zhengzhou 450001, Henan, Peoples R China
关键词
Group AHP; Agent Construction System; Risk Evaluation;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Agent construction system is a new project management mode to meet the need of modem engineering construction, and is an innovation of government investment engineering management mode. There are some positive aspects and some risks during the implementation. This paper analyses the risk factors based on the agent construction system with projects characteristics, establishes risk indicator system, utilizes AHP and group decision - making methods to measure the weights of these factors, calculates the risk degrees with Delphi technique which considers the experts' trust, and finally, the paper gives an example to show how to use this method. This paper sets up a reasonable and effectively method for projects risk management with agent construction system.
引用
收藏
页码:462 / 466
页数:5
相关论文
共 50 条
  • [1] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [2] Research on Thermal Power Plant Construction Project Risk Evaluation Based on AHP and Gray Relational analysis
    Li Jianqing
    Niu Dongxiao
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2009, : 62 - 65
  • [3] Research of the Post Evaluation model for the Productivity Construction Project of Oilfield Based on the AHP
    Du, Ruishan
    Li, Yang
    Tian, Feng
    Xie, Hongtao
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2014, 14 (10): : 1 - 4
  • [4] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [5] Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method
    Zhao, Huiru
    Guo, Sen
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [6] AHP-Based Research on the Selection of Construction Project Subcontractor
    Cheng, Min
    Ma, Guangxia
    Sun, Jinkun
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 3035 - 3039
  • [7] Research on Security Evaluation System of Construction Machines and Tools of Transmission and Transformation Project based on AHP
    Peng Fei
    Jiang Ming
    Liu Kai
    Tang Guangrui
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS, ROBOTICS AND AUTOMATION (ICMRA 2015), 2015, 15 : 1231 - 1235
  • [8] Construction Program Evaluation of Public project based on AHP and DEA
    Qi, Baoku
    Li, Changfu
    Zhao, Lu
    Wang, Mingzhen
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2215 - 2221
  • [9] Research on DSM Project Evaluation Model Based on AHP
    Wang, Li
    Wang, Xiao-duan
    Mi, Qing
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ENGINEERING, 2015, 17 : 28 - 33
  • [10] A Research on Risk Management of Agent Construction System of Engineering Project
    Gang, Li
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I & II, 2016, : 1157 - 1163