共 50 条
- [31] Stress paths around a 3-D numerically simulated NATM tunnel in stiff clay [J]. GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 443 - 449
- [32] Settlement control during the construction of urban tunnels by NATM construction of Kitayama Tunnel on national highway 455 [J]. UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1021 - 1026
- [33] OBSERVATIONS ON THE BEHAVIOR OF A PILOT TUNNEL IN LONDON CLAY AS THE MAIN TUNNEL WAS DRIVEN - DISCUSSION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1984, 76 (MAY): : 571 - 588
- [34] Neighboring construction of portal part in large cross-sectional diversion tunnel by NATM [J]. TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 969 - 974
- [35] ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2019, 18 (06): : 1177 - 1191
- [37] NAKAMURA TUNNEL HIGHLIGHTS NATM. [J]. Tunnels and Tunnelling International, 1988, 20 (03): : 47 - 49
- [38] Canopied portals for NATM rail tunnel [J]. Tunnels and Tunnelling International, 1993, 25 (09): : 34 - 36
- [40] ''London currents'' in the numerical modelling of superconductors [J]. JOURNAL DE PHYSIQUE III, 1997, 7 (10): : 1983 - 1994