Settlement control during the construction of urban tunnels by NATM construction of Kitayama Tunnel on national highway 455

被引:0
|
作者
Komatsu, Toshihiko
Kitamura, Hideyuki
Matsubara, Ken
Sakurai, Takaomi
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Kitayama Tunnel is constructed by the New Austrian Tunneling Method (NATM) through urban hills. The earth cover is thin throughout the tunnel alignment. It is necessary to control surface settlements according to the type of land use above the tunnel. The tunnel is stabilized by reinforcing the excavation face, tunnel crown and the foot of top heading, and giving priority to early closing of the ring. Ground stabilization ahead of the excavation face and the early reinforcement at the foot of top heading in particular were found to help control surface settlements.
引用
收藏
页码:1021 / 1026
页数:6
相关论文
共 50 条
  • [1] An evaluation of the role of monitoring during the construction of shallow NATM tunnels in urban areas
    van der Berg, JP
    Clayton, CRI
    Hope, VS
    NORTH AMERICAN TUNNELING '98, 1998, : 251 - 257
  • [2] Surface settlement due to the construction of the London Bridge station tunnels by NATM
    Zeidler, K
    Groves, P
    Sharrocks, D
    Allen, R
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 429 - 434
  • [3] Settlement control of highway roadbed under shallow tunnel underpass construction conditions
    Li J.
    Xu R.
    Gao T.
    Ouyang L.
    Yang Z.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2024, 64 (07): : 1252 - 1263
  • [4] Numerical simulation for settlement urban tunnel construction
    WANG Qingsong
    YU Qingyang
    Global Geology, 2014, 17 (03) : 170 - 175
  • [5] Selecting auxiliary construction methods for NATM tunnel excavation in urban areas
    Yorita, J.
    Sasaki, Y.
    Yamaki, N.
    Okamura, M.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1111 - 1116
  • [6] Convergence and Settlement Monitoring During Construction of Metro Tunnels
    Liu Shaotang
    Ji Zhigang
    Liang Yubao
    Fan Wenping
    Liao Zhongping
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 464 - 469
  • [7] Study on Settlement of Highway Bed due to Underground Construction of Crossing Railway Tunnels
    Lou, Guochong
    Wang, Shudong
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1846 - +
  • [8] Necessity of a risk-based approach to the planning, design and construction of NATM tunnels in urban situations
    Anderson, JM
    Lance, GA
    TUNNELLING '97, 1997, : 331 - 340
  • [9] Appraisal of highway tunnels construction on the active railroad tunnel operational reliability in the city of Sochi
    Frolov, Y. S.
    Konkov, A. N.
    Svintsov, E. S.
    PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE TRANSPORTATION GEOTECHNICS AND GEOECOLOGY (TGG-2017), 2017, 189 : 811 - 817
  • [10] Novel Excavation and Construction Method of an Underground Highway Tunnel above Operating Metro Tunnels
    Chen, Jin-Jian
    Zhu, Yan-Fei
    Li, Ming-Guang
    Wen, Suo-Lin
    JOURNAL OF AEROSPACE ENGINEERING, 2015, 28 (06)