Scheduling Optimization Modelling: A Case Study of a Woven Label Manufacturing Company

被引:5
|
作者
Wang, Chia-Nan [1 ]
Cheng, Zhao-Hong [2 ]
Phan, Nguyen Ky Phuc [3 ]
Nguyen, Van Thanh [4 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Ind Engn & Management, Kaohsiung 80778, Taiwan
[2] Natl Kaohsiung Univ Sci & Technol, Dept Int Business, Kaohsiung 80778, Taiwan
[3] Int Univ, Fac Ind Engn & Management, Ho Chi Minh City 70000, Vietnam
[4] Van Lang Univ, Fac Commerce, Ho Chi Minh City 70000, Vietnam
来源
关键词
Flexible job shop scheduling; Woven labelling; Garment industry; Optimization; Production scheduling; SINGLE-MACHINE EARLINESS; PARALLEL MACHINES; COMPLETION TIMES; TARDINESS; CONSTRAINTS; DEVIATION; ALGORITHM; COMMON;
D O I
10.32604/csse.2021.016578
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Production scheduling involves all activities of building production schedules, including coordinating and assigning activities to each person, group of people, or machine and arranging work orders in each workplace. Production scheduling must solve all problems such as minimizing customer wait time, storage costs, and production time; and effectively using the enterprise's human resources. This paper studies the application of flexible job shop modelling on scheduling a woven labelling process. The labelling process includes several steps which are handled in different work-stations. Each workstation is also comprised of several identical parallel machines. In this study, job splitting is allowed so that the power of work stations can be utilized better. The final objective is to minimize the total completion time of all jobs. The results show a significant improvement since the new planning may save more than 60% of lead time compared to the current schedule. The contribution of this research is to propose a flexible job shop model for scheduling a woven labelling process. The proposed approach can also be applied to support complex production scheduling processes under fuzzy environments in different industries. A practical case study demonstrates the effectiveness of the proposed model.
引用
收藏
页码:239 / 249
页数:11
相关论文
共 50 条
  • [31] Manufacturing backsourcing: a case study of a company's process framework
    Solli-Saether, Hans
    Karlsen, Jan Terje
    Slyngstad, Andrea Blindheim
    [J]. EUROPEAN JOURNAL OF INTERNATIONAL MANAGEMENT, 2023, 19 (02) : 177 - 197
  • [32] Machine translation for manufacturing: A case study at ford motor company
    Rychtyckyj, Nestor
    [J]. AI MAGAZINE, 2007, 28 (03) : 31 - 43
  • [33] Lean Manufacturing Practices Assessment Case Study of Automotive Company
    Habek, Patrycja
    Lavios, Juan J.
    Grzywa, Adam
    [J]. PRODUCTION ENGINEERING ARCHIVES, 2023, 29 (03) : 311 - 318
  • [34] Lean Manufacturing Effects in a Serbian Confectionery Company - Case Study
    Djekic, Ilija
    Zivanovic, Dragan
    Dragojlovic, Sladjana
    Dragovic, Radoslava
    [J]. ORGANIZACIJA, 2014, 47 (03) : 143 - 152
  • [35] IMPLEMENTING SUSTAINABLE MANUFACTURING PRACTICES IN A PRINTING COMPANY: A CASE STUDY
    Hami, Norsiah
    Yamin, Fadhilah Mat
    Shafie, Shafini Mohd
    Muhamad, Mohd Razali
    [J]. 2ND CONFERENCE ON TECHNOLOGY AND OPERATIONS MANAGEMENT (2NDCTOM): EMERGING ISSUES IN TECHNOLOGY AND OPERATIONS MANAGEMENT IN ERA OF CHANGE, 2018, : 370 - 376
  • [36] Greening manufacturing practices in a continuous process industry Case study of a cement manufacturing company
    Fore, S.
    Mbohwa, C.
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2015, 13 (01) : 94 - 122
  • [37] An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company
    Mohammadi, S.
    Al-e-Hashem, S. M. J. Mirzapour
    Rekik, Y.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 219 (219) : 347 - 359
  • [38] Stochastic modelling of provisions in company providing loans - case study
    Friebel, Ludvik
    Friebelova, Jana
    [J]. MATHEMATICAL METHODS IN ECONOMICS (MME 2018), 2018, : 104 - 108
  • [39] Optimization of operations in a steel wire manufacturing company
    Thomas, J
    Todi, J
    Paranjpe, A
    [J]. PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1151 - 1156
  • [40] OPTIMIZATION IN POTTERY MANUFACTURING - CASE-STUDY
    GAY, PW
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1978, 29 (04) : 323 - 327