An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company

被引:87
|
作者
Mohammadi, S. [1 ]
Al-e-Hashem, S. M. J. Mirzapour [2 ]
Rekik, Y. [3 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn & Management Syst, Tehran, Iran
[2] Rennes Sch Business, 2 Rue Robert dArbrissel, F-35065 Rennes, France
[3] EMLYON Business Sch, DISP Lab, 23 Ave Guy Collongue, F-69130 Ecully, France
关键词
Supply chain scheduling; Multi-objective optimization; Integrated production-distribution; epsilon-constraint method; Hybrid particle swarm optimization algorithm; OPTIMIZATION;
D O I
10.1016/j.ijpe.2019.05.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Recently, many modern industries have adopted joint scheduling of production and distribution decisions. Such coordination is necessary in make-to-order (MTO) businesses, where it is challenging to achieve timely delivery at minimum total cost and meet the requirements for high customization. To deal with these challenges, a practical production configuration and delivery method is required, in addition to a closer link between production and distribution schedules. Hence, in this study, we address an integrated production scheduling-vehicle routing problem with a time window, where it is assumed that production is performed in a flexible job-shop system. Our framework is modeled as a novel bi-objective mixed integer problem, in which the first objective function aims to minimize a sum of the production and distribution scheduling costs, and the second objective function tries to minimize a weighted sum of delivery earliness and tardiness. To practically validate the application of our framework, a case study from a furniture manufacturing company producing customized goods is considered, and experimental data are derived. Based on the real data, the model is first optimally solved by an epsilon-constraint method, and then a Hybrid Particle Swarm Optimization (HPSO) algorithm is developed to solve the model for medium- and large-sized problems in a reasonable time. We discuss the benefits of integration by comparing the results of the proposed model with that of the separate approach. The results show that the company can establish a proper rational balance between cost and customer concerns, and they can use the integration policy as a lever to improve customer satisfaction without the system experiencing a significant increase in total operational cost.
引用
收藏
页码:347 / 359
页数:13
相关论文
共 28 条
  • [1] A binary coding genetic algorithm for multi-purpose process scheduling: A case study
    He, Yaohua
    Hui, Chi-Wai
    [J]. CHEMICAL ENGINEERING SCIENCE, 2010, 65 (16) : 4816 - 4828
  • [2] A case study on integrated production planning and scheduling in a three-stage manufacturing system
    Yan, Hong-Sen
    Zhang, Xiao-Dong
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2007, 4 (01) : 86 - 92
  • [3] A Heuristic Approach to Support Route Planning for Delivery and Installation of Furniture: A Case Study
    Ferreira, Ines A.
    Bento, Catarina
    Mascarenhas, Luis
    Pimentel, Carina
    Carvalho, Helena
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (05):
  • [4] Production Planning Optimization in F Company: A Scheduling Theory Case Study
    Zhang, Chi
    He, Zhen
    Ruan, Yuanpeng
    [J]. ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES, PTS 1-3, 2013, 655-657 : 1646 - 1649
  • [5] Production planning and scheduling optimization model: a case of study for a glass container company
    Laura Hervert-Escobar
    Jesus Fabián López-Pérez
    [J]. Annals of Operations Research, 2020, 286 : 529 - 543
  • [6] Production planning and scheduling optimization model: a case of study for a glass container company
    Hervert-Escobar, Laura
    Lopez-Perez, Jesus Fabian
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 286 (1-2) : 529 - 543
  • [7] Production planning and inventory control in a company manufacturing PC parts: a case study
    Takahashi, K
    Nakamura, N
    [J]. PRODUCTION PLANNING & CONTROL, 2001, 12 (03) : 296 - 308
  • [8] Stakeholder salience and prioritization for port master planning, a case study of the multi-purpose Port of Isafjordur in Iceland
    Eskafi, Majid
    Fazeli, Reza
    Dastgheib, Ali
    Taneja, Poonam
    Ulfarsson, Gudmundur F.
    Thorarinsdottir, Ragnheidur, I
    Stefansson, Gunnar
    [J]. EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH, 2019, 19 (03): : 214 - 260
  • [9] Stakeholder salience and prioritization for port master planning, a case study of the multi-purpose port of isafjordur in Iceland
    Eskafi, Majid
    Fazeli, Reza
    Dastgheib, Ali
    Taneja, Poonam
    Ulfarsson, Gudmundur F.
    Thorarinsdottir, Ragnheidur I.
    Stefansson, Gunnar
    [J]. European Journal of Transport and Infrastructure Research, 2019, 19 (03): : 214 - 260
  • [10] Integrated tactical production planning with multi transportation modes and multi supply sources: the case of a phosphate company
    Azzamouri, Bassma
    Hovelaque, Vincent
    Giard, Vincent
    [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 872 - 877