Scheduling with product family set-up times: an application in TFT LCD manufacturing

被引:28
|
作者
Shin, HJ [1 ]
Leon, VJ [1 ]
机构
[1] Texas A&M Univ, Dept Ind Engn, College Stn, TX 77843 USA
关键词
D O I
10.1080/00207540410001708461
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The development of a scheduling methodology for module processing in thin film transistor liquid crystal display manufacturing is presented. The problem is a parallel machine-scheduling problem with family set-up times and due dates. Two objectives are considered: total tardiness and the number of family set-ups. Two heuristics are developed based on the MULTIFIT method and tabu search. The experimental results show that the proposed algorithms give schedules that are very efficient in terms of both total tardiness and the number of family set-ups.
引用
收藏
页码:4235 / 4248
页数:14
相关论文
共 50 条
  • [1] A HEURISTIC FOR PREEMPTIVE SCHEDULING WITH SET-UP TIMES
    WOGINGER, GJ
    YU, Z
    COMPUTING, 1992, 49 (02) : 151 - 158
  • [2] Scheduling parallel machines to minimize weighted flowtime with family set-up times
    Azizoglu, M
    Webster, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (06) : 1199 - 1215
  • [3] Scheduling with shutdowns and sequence dependent set-up times
    Department of Industrial Engineering, College of Engineering, Osaka Prefecture University, Gakuencho, Sakai, Osaka, 599-8531, Japan
    Int J Prod Res, 7 (1661-1676):
  • [4] Scheduling with shutdowns and sequence dependent set-up times
    Asano, M
    Ohta, H
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (07) : 1661 - 1676
  • [5] Scheduling jobs on parallel machines with sequence-dependent family set-up times
    Eom, DH
    Shin, HJ
    Kwun, IH
    Shim, JK
    Kim, SS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (12): : 926 - 932
  • [6] Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up Times
    D.-H. Eom
    H.-J. Shin
    I.-H. Kwun
    J.-K. Shim
    S.-S. Kim
    The International Journal of Advanced Manufacturing Technology, 2002, 19 : 926 - 932
  • [7] An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times
    Liao, Ching-Jong
    Chao, Chien-Wen
    Chen, Liang-Chuan
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2012, 63 (01) : 110 - 117
  • [8] FLOWSHOP SCHEDULING WITH SET-UP, PROCESSING AND REMOVAL TIMES SEPARATED
    PROUST, C
    GUPTA, JND
    DESCHAMPS, V
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (03) : 479 - 493
  • [9] Application of optimization techniques to parameter set-up in scheduling
    Talbi, ED
    Geneste, L
    Grabot, B
    Prévitali, R
    Hostachy, P
    COMPUTERS IN INDUSTRY, 2004, 55 (02) : 105 - 124
  • [10] A new heuristic for a single machine scheduling problem with set-up times
    Williams, D
    Wirth, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (01) : 175 - 180