Assessing issues of financing a CO2 transportation pipeline infrastructure

被引:14
|
作者
Chrysostomidis, Ioannis [2 ]
Zakkour, Paul [2 ]
Bohm, Mark [3 ]
Beynon, Eric [3 ]
de Filippo, Renato [4 ]
Lee, Arthur [1 ]
机构
[1] Chevron Corp, 6001 Bollinger Canyon Rd, San Ramon, CA 94583 USA
[2] Environemtal Resources Management, London, England
[3] Suncor Energy, Calgary, AB, Canada
[4] Eni SpA, Milan, Italy
来源
关键词
Carbon dioxide capture and geologic storage (CCS); CO2; pipelines; financing; backbone pipelines; point-to-point pipelines; CO2 Capture Project;
D O I
10.1016/j.egypro.2009.01.213
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
For carbon dioxide capture and geologic storage to be deployed commercially and in a widespread manner will require well thought out approaches for transporting the CO2 in a pipeline system from the capture facility to the injection site. Establishing a widespread CO2 transportation infrastructure will require strategic long-term planning, taking into account the potential magnitude of future deployment scenarios for CCS, up to a scale of infrastructure that could be comparable to the scale of oil & gas infrastructure. This paper outlines the results of a study, commissioned by the CO2 Capture Project (CCP) and completed by Environmental Resources Management (ERM) that evaluated the benefits and risks of two approaches to developing CO2 pipeline systems. The two basic approaches are described in the paper as: 1. On a point-to-point basis, which matches a specific source to a specific storage location; or 2. Via the development of pipeline networks, including backbone pipeline systems, which allow for common carriage of CO2 from multiple sources to multiple sinks. An integrated approach to pipeline infrastructure approach offers the lowest average cost on a per ton basis for operators over the life of the projects if sufficient capacity utilization is achieved relatively early in the life of the pipeline. Integrated pipelines also reduce the barriers to entry and are more likely to lead to faster development and deployment of CCS. Without incentives to encourage the development of optimized networks project developers are likely to build point to point pipelines because they offer lower costs for the first movers and do not have the same capacity utilization risk. (C) 2009 Chevron Corporation. Published by Elsevier Ltd. All rights reserved
引用
收藏
页码:1625 / 1632
页数:8
相关论文
共 50 条
  • [41] Explosion of hydrogen in a pipeline for CO2
    Pande, J.O.
    Tonheim, J.
    Ammonia Plant Safety and Related Facilities, 2001, 41 : 254 - 259
  • [42] Negative CO2 Emissions for Transportation
    Jaspers, B. C.
    Kuo, Po-Chih
    Amladi, Amogh
    van Neerbos, Wouter
    Aravind, P. V.
    FRONTIERS IN ENERGY RESEARCH, 2021, 9
  • [43] Costs of CO2 transportation infrastructures
    Mallon, Wim
    Buit, Luuk
    van Wingerden, Janneke
    Lemmens, Han
    Eldrup, Nils Henrik
    GHGT-11, 2013, 37 : 2969 - 2980
  • [44] Prospects of natural gas pipeline infrastructure in hydrogen transportation
    Gondal, Irfan Ahmad
    Sahir, Mukhtar Hussain
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2012, 36 (15) : 1338 - 1345
  • [45] Attractiveness of transportation infrastructure projects to private-sector financing - Assessing the hierarchical analysis, risk scenario method
    Tsamboulas, D
    Panou, K
    Abacoumkin, C
    TRANSPORTATION FINANCE, PRICING, AND ECONOMICS: PLANNING AND ADMINISTRATION: HIGHWAY OPERATIONS, CAPACITY, AND TRAFFIC CONTROL, 2000, (1732): : 12 - 21
  • [46] Case Studies on CO2 Transport Infrastructure: Optimization of Pipeline Network, Effect of Ownership, and Political Incentives
    Brunsvold, A.
    Jakobsen, J. P.
    Husebye, J.
    Kalinin, A.
    10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 3024 - 3031
  • [47] Case studies on CO2 transport infrastructure: Optimization of pipeline network, effect of ownership, and political incentives
    SINTEF Energy Research, NO-7465 Trondheim, Norway
    不详
    Energy Procedia, 1876, (3024-3031):
  • [48] Attractiveness of transportation infrastructure projects to private-sector financing: Assessing the hierarchical analysis, risk scenario method
    Tsamboulas, D.
    Panou, K.
    Abacoumkin, C.
    Transportation Research Record, 2000, (1732) : 12 - 21
  • [49] Budget-type techno-economic model for onshore CO2 pipeline transportation in China
    Wei, Ning
    Li, Xiaochun
    Wang, Qian
    Gao, Shuai
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2016, 51 : 176 - 192
  • [50] Optimization of liquefaction cycles applied to CO2 coming from onshore pipeline to offshore ship transportation
    Costa, Alexis
    Dubois, Lionel
    Thomas, Diane
    De Weireld, Guy
    CARBON CAPTURE SCIENCE & TECHNOLOGY, 2024, 13