Assessing issues of financing a CO2 transportation pipeline infrastructure

被引:14
|
作者
Chrysostomidis, Ioannis [2 ]
Zakkour, Paul [2 ]
Bohm, Mark [3 ]
Beynon, Eric [3 ]
de Filippo, Renato [4 ]
Lee, Arthur [1 ]
机构
[1] Chevron Corp, 6001 Bollinger Canyon Rd, San Ramon, CA 94583 USA
[2] Environemtal Resources Management, London, England
[3] Suncor Energy, Calgary, AB, Canada
[4] Eni SpA, Milan, Italy
来源
关键词
Carbon dioxide capture and geologic storage (CCS); CO2; pipelines; financing; backbone pipelines; point-to-point pipelines; CO2 Capture Project;
D O I
10.1016/j.egypro.2009.01.213
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
For carbon dioxide capture and geologic storage to be deployed commercially and in a widespread manner will require well thought out approaches for transporting the CO2 in a pipeline system from the capture facility to the injection site. Establishing a widespread CO2 transportation infrastructure will require strategic long-term planning, taking into account the potential magnitude of future deployment scenarios for CCS, up to a scale of infrastructure that could be comparable to the scale of oil & gas infrastructure. This paper outlines the results of a study, commissioned by the CO2 Capture Project (CCP) and completed by Environmental Resources Management (ERM) that evaluated the benefits and risks of two approaches to developing CO2 pipeline systems. The two basic approaches are described in the paper as: 1. On a point-to-point basis, which matches a specific source to a specific storage location; or 2. Via the development of pipeline networks, including backbone pipeline systems, which allow for common carriage of CO2 from multiple sources to multiple sinks. An integrated approach to pipeline infrastructure approach offers the lowest average cost on a per ton basis for operators over the life of the projects if sufficient capacity utilization is achieved relatively early in the life of the pipeline. Integrated pipelines also reduce the barriers to entry and are more likely to lead to faster development and deployment of CCS. Without incentives to encourage the development of optimized networks project developers are likely to build point to point pipelines because they offer lower costs for the first movers and do not have the same capacity utilization risk. (C) 2009 Chevron Corporation. Published by Elsevier Ltd. All rights reserved
引用
收藏
页码:1625 / 1632
页数:8
相关论文
共 50 条
  • [21] CO2 pipeline to Canada
    不详
    PIPELINE & GAS JOURNAL, 1997, 224 (08) : 6 - 6
  • [22] Integrity and Safety Management Challenges of Supercritical CO2 Pipeline Transportation at Offshore Platforms
    Hu, Jinqiu
    Zhang, Laibin
    Xiao, Shangrui
    Ma, Wenhao
    Li, Xingtao
    Xia, Gang
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2024, 15 (04)
  • [23] Assessing Compatibility of Natural Gas Pipeline Materials with Hydrogen, CO2, and Ammonia
    Kass, Michael D.
    Keiser, James R.
    Liu, Yan
    Moore, Amy
    Polsky, Yarom
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2023, 14 (02)
  • [24] Assessing the impact of cost optimization based on infrastructure modelling on CO2 emissions
    Harris, Irina
    Naim, Mohamed
    Palmer, Andrew
    Potter, Andrew
    Mumford, Christine
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 131 (01) : 313 - 321
  • [25] CO2 TRANSPORTATION SYSTEM
    SKOVHOLT, O
    ENERGY CONVERSION AND MANAGEMENT, 1993, 34 (9-11) : 1095 - 1103
  • [26] Assessing the risk for CO2 transportation within CCS projects, CFD modelling
    Mazzoldi, Alberto
    Hill, Tim
    Colls, Jeremy J.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2011, 5 (04) : 816 - 825
  • [27] CO2 maritime transportation
    Decarre, Sandrine
    Berthiaud, Julien
    Butin, Nicolas
    Guillaume-Combecave, Jean-Louis
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2010, 4 (05) : 857 - 864
  • [29] Leakage diffusion and safety assessment of CO2 pipeline transportation flange based on CFD simulation
    Huang, Weiqiu
    Xiao, Yilan
    Li, Xufei
    Ning, Zhou
    GREENHOUSE GASES-SCIENCE AND TECHNOLOGY, 2024, 14 (05): : 728 - 742
  • [30] A nonlinear interval number programming algorithm for CO2 pipeline transportation design under uncertainties
    Tian, Qunhong
    Zhao, Dongya
    Wang, Jiafeng
    Li, Zhaomin
    GREENHOUSE GASES-SCIENCE AND TECHNOLOGY, 2019, 9 (02): : 261 - 275