Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop

被引:69
|
作者
Oguz, C [1 ]
Ercan, MF
Cheng, TCE
Fung, YF
机构
[1] Hong Kong Polytech Univ, Dept Management, Kowloon, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Dept Elect Engn, Kowloon, Hong Kong, Peoples R China
关键词
heuristics; flow-shop; makespan; multiprocessor task scheduling; performance evaluation;
D O I
10.1016/S0377-2217(02)00766-X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The aim of this paper is to propose heuristic algorithms for a two-stage flow-shop scheduling problem with multiprocessor tasks to minimize the makespan. The heuristic algorithms are constructive in nature. They schedule the tasks one at a time from a given sequence. The rules considered for sequencing the tasks are based on simple priority rules from the literature. Some lower bounds for the problem are also derived to be used in the performance analysis of the heuristic algorithms. Next, the average performance of the proposed heuristic algorithms is analyzed by a computational experiment using randomly generated problem instances. The results suggest that these heuristic algorithms are both efficient and effective. The paper concludes with a discussion of the insights obtained from the experimental analysis about this type of scheduling problems. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:390 / 403
页数:14
相关论文
共 50 条
  • [41] A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    Tseng, Chao-Tang
    Liao, Ching-Jong
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4655 - 4670
  • [42] Distributed two-stage hybrid flow shop scheduling with setup times
    Cai J.
    Lei D.
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2020, 26 (08): : 2170 - 2179
  • [43] Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system
    Basir, Saeedeh Ahmadi
    Mazdeh, Mohammad Mandavi
    Namakshenas, Mohammad
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 217 - 231
  • [44] Research on Two-Stage Hybrid Flow Shop Scheduling with Contiguous Machines
    Zhang Minghui
    Li Xiaofei
    [J]. 2019 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS 2019), 2019, : 458 - 461
  • [45] Two-stage hybrid flow shop scheduling with dynamic job arrivals
    Yao, Frank S.
    Zhao, Mei
    Zhang, Hui
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1701 - 1712
  • [46] Heuristic algorithms for scheduling in a multiprocessor two-stage flowshop with 0-1 resource requirements
    Figielska, Ewa
    [J]. ICINCO 2007: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL ICSO: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2007, : 452 - 455
  • [47] An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop
    Dong, Jianming
    Jiang, Yiwei
    Zhang, An
    Hu, Jueliang
    Luo, Hui
    [J]. INFORMATION PROCESSING LETTERS, 2015, 115 (04) : 475 - 480
  • [48] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    Navaei, J.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Shiraqai, M. E.
    Hidaji, H.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
  • [49] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    J. Navaei
    S. M. T. Fatemi Ghomi
    F. Jolai
    M. E. Shiraqai
    H. Hidaji
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
  • [50] A note, on "A heuristic method for two-stage hybrid flow shop with dedicated machines"
    Hadda, Hatem
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (10) : 2283 - 2283