Full scale parallel operation of a biological aerated filter (BAF) and activated sludge (AS) for nitrogen removal

被引:0
|
作者
Thogersen, T [1 ]
Hansen, R [1 ]
机构
[1] Publ Works Dept, DK-9900 Frederikshavn, Denmark
关键词
activated sludge plant (AS); biological aerated filter (BAF); control strategy; operating costs; operating experience; operational optimization; parallel operation; wet weather load;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In connection with the reconstruction and capacity extension of the Frederikshavn Central Wastewater Treatment Plant in the period between 1989 and 1995 the existing activated sludge plant (AS) was supplemented with a biological aerated filter (BAF). The parallel operation with two wastewater flows has made a comparison of the two plants possible in relation to operating data, operating costs and experience. For the purpose of optimizing the operation, tests were conducted to increase the hydraulic capacity of the plant during rain and control strategies for the plants were considered for dry weather as well as wet weather situations. This paper discusses the experience gained from the plant operation as well as the considerations made in relation to future control strategies and possibilities of increasing the total hydraulic capacity during rain.
引用
收藏
页码:159 / 168
页数:10
相关论文
共 50 条
  • [31] The effect of chemical bulking control on biological nutrient removal in a full scale activated sludge plant
    Saayman, GB
    Schutte, CF
    vanLeeuwen, J
    [J]. WATER SCIENCE AND TECHNOLOGY, 1996, 34 (3-4) : 275 - 282
  • [32] The effect of media size on biological aerated filter (BAF) performance
    Kent, T
    Fitzpatrick, C
    Williams, S
    [J]. 1996 ICHEME RESEARCH EVENT - SECOND EUROPEAN CONFERENCE FOR YOUNG RESEARCHERS IN CHEMICAL ENGINEERING, VOLS 1 AND 2, 1996, : 687 - 689
  • [33] Modelling the nitrification in a full-scale tertiary biological aerated filter unit
    Bernier, Jean
    Rocher, Vincent
    Guerin, Sabrina
    Lessard, Paul
    [J]. BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2014, 37 (02) : 289 - 300
  • [34] Modelling the nitrification in a full-scale tertiary biological aerated filter unit
    Jean Bernier
    Vincent Rocher
    Sabrina Guerin
    Paul Lessard
    [J]. Bioprocess and Biosystems Engineering, 2014, 37 : 289 - 300
  • [35] Sensors to monitor biological nitrogen removal and activated sludge settling
    Gernaey, K
    Vanderhasselt, AA
    Bogaert, H
    Vanrolleghem, P
    Verstraete, W
    [J]. JOURNAL OF MICROBIOLOGICAL METHODS, 1998, 32 (02) : 193 - 204
  • [36] NITROGEN REMOVAL IN CONTINUOUS-FLOW SEQUENTIALLY AERATED ACTIVATED-SLUDGE SYSTEMS
    GORONSZY, MC
    BARNES, D
    [J]. PROCESS BIOCHEMISTRY, 1982, 17 (01) : 13 - 19
  • [37] Biological phosphorus and nitrogen removal with biological aerated filter using denitrifying phosphorus accumulating organism
    Lee, J
    Kim, J
    Lee, C
    Yun, Z
    Choi, E
    [J]. WATER SCIENCE AND TECHNOLOGY, 2005, 52 (10-11) : 569 - 578
  • [38] A THEORY OF THE OPERATION OF FULL-SCALE ACTIVATED-SLUDGE PLANTS
    TENCH, HB
    [J]. WATER RESEARCH, 1994, 28 (05) : 1019 - 1024
  • [39] Development and application of Palygorskite porous ceramsite in a biological aerated filter (BAF)
    Bao, Teng
    Chen, Tian-hu
    Qing, Chengsong
    Xie, Jin Jin
    Frost, Ray L.
    [J]. DESALINATION AND WATER TREATMENT, 2016, 57 (04) : 1790 - 1803
  • [40] Nitrification performance and its kinetic characteristic of biological aerated filter (BAF)
    Qiu, LP
    Ma, J
    Zhang, LX
    Yang, YF
    [J]. Future of Urban Wastewater Systems - Decentralisation and Reuse, 2005, : 769 - 777