摘要
This paper presents the experience on how Entergy Transmission Engineering Group started the IEC 61850 effort together with collaborators such as vendors, research institutes, utility companies, and standard committee. The project was initially started with the intension to learn about the technology and had gradually evolved into an open platform testbed for multivendor interoperability of their Intelligent Electronics Devices (IED), which eventually had gained support and interest to start a pilot project to deploy a parallel IEC 61850 process bus system into one of the substations in New Orleans - Joliet Sub. This paper will share the goals and the design of the pilot substation, Joliet and future design concepts of Entergy's next digital substation.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Relay protection design scheme of 220 kV substation for application of IEC 61850
    Li, Hui
    Zhao, Meng
    Yang, Wei-Xing
    He, Ben-Teng
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (06): : 60 - 63
  • [42] Implementation and Testing of Directional Comparison Bus Protection Based on IEC61850 Process Bus
    Zadeh, Mohammad R. D.
    Sidhu, Tarlochan S.
    Klimek, Andrew
    IEEE TRANSACTIONS ON POWER DELIVERY, 2011, 26 (03) : 1530 - 1537
  • [43] Dependability optimization of process-level protection in an IEC-61850-based substation
    Altaher, A.
    Mocanu, S.
    Thiriet, J. M.
    RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, 2017, : 1757 - 1764
  • [44] First substation with IEC61850 commissioned in the Americas
    Rodrigues, Jose
    Soldani, Leonardo
    Wong, Gordon
    2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 1430 - +
  • [45] Impacts of IEC 61850 digital substation on relaying protection
    He, Shi-En
    Liu, Jun
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (03): : 1 - 4
  • [46] Disturbance recording in IEC 61850 substation automation systems
    Apostolov, A.
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 921 - 926
  • [47] Harmonizing IEC 61850 and CIM for connectivity of substation automation
    Lee, Byunghun
    Kim, Dae-Kyoo
    COMPUTER STANDARDS & INTERFACES, 2017, 50 : 199 - 208
  • [48] Toward a Substation Automation System Based on IEC 61850
    Kumar, Shantanu
    Abu-Siada, Ahmed
    Das, Narottam
    Islam, Syed
    ELECTRONICS, 2021, 10 (03) : 1 - 16
  • [49] Communications in IEC 61850 based substation automation systems
    Apostolov, A.
    2006 Power Systems Conference Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2006, : 51 - 56
  • [50] Substation clock server meeting IEC61850
    Zhou, Shui-Bin
    Tian, Zhi-Guo
    Zhao, Ying-Bing
    Yan, Zhi-Hui
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (07): : 56 - 58