共 50 条
- [1] THE MONITORING AND FEEDBACK ANALYSIS OF THE VAULT SLOPE DEFORMATION FOR THE PERMEABLE RIB DOUBLE-ARCH TUNNEL [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 2931 - 2937
- [2] Key Technology and Mechanical Behavior Simulation of a Double-arch Subway Tunnel [J]. Hu, Zhiping, 1600, Editorial Department of Journal of Railway Engineering Society, China (37): : 95 - 100
- [4] Study of the influence of double-arch tunnel construction on ground water seepage field [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (05): : 104 - 110
- [5] Mechanical Characteristics of an Open-Buried Double-Arch Tunnel during Construction [J]. APPLIED SCIENCES-BASEL, 2023, 13 (06):
- [6] 3D numerical simulation of a large span double-arch tunnel construction [J]. COMPUTATIONAL METHODS, PTS 1 AND 2, 2006, : 1853 - +
- [7] Deformation and stability of mid-board in process of highway double-arch tunnel construction [J]. Zongguo Gonglu Xuebao, 2007, 5 (83-88):
- [8] 3D numerical simulation on double-arch tunnel's construction process [J]. Chang'an Daxue Xuebao (Ziran Kexue Ban)/Journal of Chang'an University (Natural Science Edition), 2005, 25 (01): : 48 - 50
- [9] EVOLUTION CHARACTERISTICS ANALYSIS OF PRESSURE-ARCH IN A DOUBLE-ARCH TUNNEL [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2016, 23 (01): : 181 - 189
- [10] Design technology for unequal span double-arch tunnel under shallow biasing condition [J]. Zheng, Z.-X., 1600, Editorial Department of Journal of Railway Engineering Society, China (30):