共 50 条
- [1] 3D numerical simulation of a large span double-arch tunnel construction [J]. COMPUTATIONAL METHODS, PTS 1 AND 2, 2006, : 1853 - +
- [2] CONSTRUCTION TECHNOLOGY OF PERMEABLE RIB DOUBLE-ARCH TUNNEL [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 2938 - 2944
- [3] Mechanical analysis on construction process of highway double-arch tunnel with 3-heading excavation method [J]. 2005, Xi'an Highway University, Xi'an, China (25):
- [4] Deformation and stability of mid-board in process of highway double-arch tunnel construction [J]. Zongguo Gonglu Xuebao, 2007, 5 (83-88):
- [5] Key Technology and Mechanical Behavior Simulation of a Double-arch Subway Tunnel [J]. Hu, Zhiping, 1600, Editorial Department of Journal of Railway Engineering Society, China (37): : 95 - 100
- [6] Model test and 3-D numerical simulation study on wall rock mass stability of double-arch tunnel subject to partial press [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2008, 36 (04): : 460 - 465
- [8] Experiment and Numerical Simulation on Grouting Reinforcement Parameters of Ultra-Shallow Buried Double-Arch Tunnel [J]. APPLIED SCIENCES-BASEL, 2021, 11 (21):
- [10] Study of the influence of double-arch tunnel construction on ground water seepage field [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (05): : 104 - 110