3D numerical simulation on double-arch tunnel's construction process

被引:0
|
作者
Hu, Qing-An [1 ]
Xia, Yong-Xu [1 ]
Wang, Wen-Zheng [1 ]
机构
[1] Lab. for Bridge and Tunnel, Chang'an Univ., Xi'an 710064, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
With three-dimensional model, this paper simulates the spatial effect of double-arch tunnel's construction, analyzes the transaction between the left tunnel and the right tunnel, and studies the deformation and stability of mid-partition. The region of the left tunnel affected by the excavation of the right tunnel is 3 B (B is the excavation span of right tunnel, B = 12 m) in front of and at the back of excavating face. During the construction of the right tunnel, the mid-partition behind the excavating face deflects to the left as a whole, the middle part of the mid-partition bulges to the left and the right toe rises. The backfill on the left of mid-partition prevents it from deforming effectively, so the quality of it should be guaranteed during construction process. Distance between the two excavating faces should be less than 2.5 B - 3.0 B to control the deformation of mid-partition.
引用
收藏
页码:48 / 50
相关论文
共 50 条
  • [1] 3D numerical simulation of a large span double-arch tunnel construction
    Xia, C. C.
    Liu, H. J.
    Zhu, H. H.
    [J]. COMPUTATIONAL METHODS, PTS 1 AND 2, 2006, : 1853 - +
  • [2] CONSTRUCTION TECHNOLOGY OF PERMEABLE RIB DOUBLE-ARCH TUNNEL
    Song, Ruijun
    Yu, Fei
    Chen, Shanxiong
    Chen, Xiuhe
    Wang, Fei
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 2938 - 2944
  • [4] Deformation and stability of mid-board in process of highway double-arch tunnel construction
    School of Highway, Chang'an University, Xi'an 710064, China
    不详
    [J]. Zongguo Gonglu Xuebao, 2007, 5 (83-88):
  • [5] Key Technology and Mechanical Behavior Simulation of a Double-arch Subway Tunnel
    双连拱地铁隧道施工关键技术及力学行为模拟
    [J]. Hu, Zhiping, 1600, Editorial Department of Journal of Railway Engineering Society, China (37): : 95 - 100
  • [6] Model test and 3-D numerical simulation study on wall rock mass stability of double-arch tunnel subject to partial press
    Liu, Tao
    Shen, Mingrong
    Yuan, Yong
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2008, 36 (04): : 460 - 465
  • [7] Investigation of cracking mechanism of the first tunnel lining during double-arch tunnel construction
    Sui, Yi
    Cheng, Xiaohui
    Zhao, Zuozhou
    Ma, Weibin
    [J]. UNDERGROUND SPACE, 2024, 14 : 1 - 17
  • [8] Experiment and Numerical Simulation on Grouting Reinforcement Parameters of Ultra-Shallow Buried Double-Arch Tunnel
    Wang, Jianxiu
    Cao, Ansheng
    Wu, Zhao
    Wang, Huanran
    Liu, Xiaotian
    Li, Huboqiang
    Sun, Yuanwei
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (21):
  • [9] Shaking Table Test and Numerical Simulation for Dynamic Response of Shallow-Buried Bias Double-Arch tunnel
    Yang, Hui
    Liu, Chan
    Jiang, Xueliang
    Shi, Hongtao
    Sun, Guangchen
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (04) : 3915 - 3929
  • [10] Study of the influence of double-arch tunnel construction on ground water seepage field
    Zhuo, Yue
    Wang, Mengshu
    Zhou, Dongyong
    [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (05): : 104 - 110