共 50 条
- [21] Study on construction method of double-arch tunnel with half-open and half-hidden structure [J]. Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (2809-2814):
- [23] Site monitoring and analytical research on mechanical characteristics under construction partial press in double-arch tunnel [J]. Yantu Lixue/Rock and Soil Mechanics, 2006, 27 (11): : 2061 - 2065
- [26] Analysis of influence of blasting vibration on middle wall of a double-arch tunnel [J]. Yantu Lixue/Rock and Soil Mechanics, 2007, 28 (06): : 1275 - 1279
- [27] Deformation mechanism of a shallow double-arch tunnel in a sloping rock mass [J]. Bulletin of Engineering Geology and the Environment, 2010, 69 : 89 - 97
- [28] Dynamic Risk Assessment of Ultra-Shallow-Buried and Large-Span Double-Arch Tunnel Construction [J]. APPLIED SCIENCES-BASEL, 2021, 11 (24):
- [29] Optimization analysis by key block theory for construction procedure of extra large-span double-arch tunnel [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 2979 - 2985
- [30] Estimation of strength and stability of surrounding rock mass for Fuxi double-arch tunnel [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2009, 31 (02): : 259 - 264