Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts

被引:8
|
作者
Shrestha, Pramen P. [1 ]
Maharjan, Ruiko [1 ]
机构
[1] Univ Nevada, Dept Civil & Environm Engn & Construct, Howard R Hughes Coll Engn, Las Vegas, NV 89154 USA
关键词
Lowest bidder; Change order percentage; Bid deviation; Cost growth; Schedule growth; Construction intensity; IMPACT;
D O I
10.1061/(ASCE)LA.1943-4170.0000323
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
For design-bid-build (DBB) projects, the assumption is that because the bid cost of the lowest bidder is usually below the estimated cost of the project, change orders during construction will increase. This study collected data on 615 small highway DBB projects (with costs of less than $1 million) from the Florida DOT (FDOT) related to the construction of roads and structures, and determined the correlation between these two variables. The study determined whether change orders affected cost and schedule performance; for projects that had no change orders or negative change orders, cost and schedule performance were significantly better than for of projects that had positive change orders. The results of this study demonstrate that projects that had positive change orders were those in which the contractors submitted bids significantly higher than those submitted for projects that had no change orders or negative change orders, even though-in both groups-the bids were lower than the estimated costs. An in-depth analysis showed that the projects that had no change orders or negative change orders had significantly lower cost and schedule growth as well as higher construction intensity compared to those of projects that had positive change orders. These results indicate that change orders have detrimental effects on cost and schedule growth, as well as construction intensity in small highway projects. The researchers recommend using a change order management process in order to reduce the effects of change orders on project costs and schedule performance. The researchers also recommend conducting a similar study with the data of all state DOTs in order to test whether the effect of change orders on cost and schedule performance of highway projects is similar to this study. The major contributions of this study to the body of knowledge are that the low bid had no effect on change orders, and positive change orders increased the cost and schedule growth as well as decreased the construction intensity of the small highway projects.
引用
收藏
页数:9
相关论文
共 17 条
  • [1] Civil challenges to the use of low-bid contracts for indigent defense
    Lemos, MH
    [J]. NEW YORK UNIVERSITY LAW REVIEW, 2000, 75 (06) : 1808 - 1842
  • [2] Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects
    Shrestha, Pramen P.
    Maharjan, Ruiko
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (03)
  • [3] Probability of change orders and the effect on cost and schedule for new public school buildings
    Shrestha, Pramen P.
    Shrestha, Kabindra Kumar
    Zeleke, Haileab B.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (06) : 1087 - 1104
  • [4] Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
    Shrestha, Pramen P.
    Zeleke, Haileab
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (04)
  • [5] Cost, Change Order, and Schedule Performance of Highway Projects
    Shrestha, Bandana
    Shrestha, Pramen P.
    Maharjan, Ruiko
    Gransberg, Douglas
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [6] Detecting Red-Flag Bidding Patterns in Low-Bid Procurement for Highway Projects with Pattern Mining
    Asaye, Lemlem
    Moriyani, Muhammad Ali
    Le, Chau
    Le, Tuyen
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2024, 40 (01)
  • [7] A low-cost and verifiable sealed bid auction protocol based on smart contracts
    Wu, Xiaohua
    Liu, Huan
    Wu, Fengheng
    Yu, Fangjian
    Ling, Hongji
    [J]. 2022 IEEE INTERNATIONAL CONFERENCE ON BLOCKCHAIN AND CRYPTOCURRENCY (IEEE ICBC 2022), 2022,
  • [8] Are bid preferences benign? The effect of small business subsidies in highway procurement auctions
    Marion, Justin
    [J]. JOURNAL OF PUBLIC ECONOMICS, 2007, 91 (7-8) : 1591 - 1624
  • [9] Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
    Shrestha, Pramen P.
    Fathi, Medya
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (03)
  • [10] Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects
    Fathi, Medya
    Shrestha, Pramen P.
    Shakya, Binita
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)