Previous research have shown that change orders have a detrimental effect on cost growth and schedule growth of construction projects. These studies mainly concentrated on the number of change orders for building or maintenance projects. However, correlation of the number and change order growth with cost growth, schedule growth, and construction intensity of new highway projects has not been studied. This study collected data from 185 projects from the state of Texas, whose costs amounted to more than $10M. The results showed that the average change order growth for these projects was 7.0%, and also found a significant positive correlation in change order growth with cost growth and schedule growth of these projects. The correlation coefficients of change order growth with cost growth and schedule growth were found to be 0.57 and 0.44, respectively. When the projects were divided into two groups based on the change order growth, the results showed that the cost growth and schedule growth significantly increased as the change order growth increased to greater than 5%. The number of change orders were significantly and positively correlated with cost growth (0.23), schedule growth (0.30), and construction intensity (0.46). When the number of change orders increased by more than 20, then the cost and schedule growth increased significantly. It is recommended that Texas Department of Transportation engineers use an effective change management process to control the change orders in their highway projects so that cost and schedule overruns could be minimized. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Cost, Change Order, and Schedule Performance of Highway Projects
    Shrestha, Bandana
    Shrestha, Pramen P.
    Maharjan, Ruiko
    Gransberg, Douglas
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [2] Administering Change Orders in Highway Projects
    Ahmed, Muaz O.
    Assaad, Rayan H.
    El-adaway, Islam H.
    Echele, Emily
    Govro, Kyle
    Watson, John
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (02)
  • [3] Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
    Shrestha, Pramen P.
    Zeleke, Haileab
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (04)
  • [4] Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts
    Shrestha, Pramen P.
    Maharjan, Ruiko
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (04)
  • [5] Information technology for better management of change, cost and schedule in construction projects
    PenaMora, F
    Chen, H
    [J]. COMPUTING IN CIVIL ENGINEERING, 1996, : 613 - 619
  • [6] Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects
    Fathi, Medya
    Shrestha, Pramen P.
    Shakya, Binita
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [7] Information technology for better management of change, cost and schedule in construction projects
    Massachusetts Inst of Technology, Cambridge, United States
    [J]. Comput Civ Eng (New York), (613-619):
  • [8] An Empirical Analysis of Sources of Cost and Schedule Growth for Facilities Projects
    Shalwani, Amirali
    Lines, Brian
    Smithwick, Jake
    Dodd, Justin
    Kasana, Dipin
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 740 - 749
  • [9] Causes of Change Orders in Construction Projects
    Khalifa, Walid M. A.
    Mahamid, Ibrahim
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (06) : 4956 - 4961
  • [10] Variations and Change Orders on Construction Projects
    Keane, Patrick
    Sertyesilisik, Begum
    Ross, Andrew David
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2010, 2 (02) : 89 - 96