Long-term scheduling of large cascade hydropower stations in Jinsha River, China

被引:53
|
作者
Wang, Chao
Zhou, Jianzhong [1 ]
Lu, Peng
Yuan, Liu
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Large hydropower stations; Long term scheduling; Ant colony optimization; Compensation analysis; ANT COLONY OPTIMIZATION; HYBRID DIFFERENTIAL EVOLUTION; ECONOMIC-DISPATCH; PROGRESSIVE OPTIMALITY; ALGORITHM; OPERATION; SYSTEMS; PLANTS; GENERATION; MODEL;
D O I
10.1016/j.enconman.2014.11.024
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Jinsha River is the third longest river in the world. It consists of four large hydropower stations with total installed capacity 42,960 MW lying on the upper stretches of the Yangtze River, which is the longest river in the word. Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a multi-population ant colony optimization for continuous domain (MACO(R)) is proposed in this paper. A Gaussian group selection strategy is applied to overcome premature convergence and ants with different characteristics are employed to enhance search ability, and circulatory solution correction strategy is presented to handle outflow, water level and output constraints. Furthermore, the efficiency and stability of MACO(R) are verified by its more desirable results in comparison to other latest works in numerical simulation, and it can be a viable alternative for solving those complicated optimal problems. With the applications in hydropower operation, LSLCHS can obtain more power generation benefit than other alternatives in dry, normal and wet year, and the compensation analysis reveals that joint operation of cascade hydropowerstations can enhance the total power generation especially in wet season. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:476 / 487
页数:12
相关论文
共 50 条
  • [21] Study on Generation Scheduling of Cascade Hydropower Stations Based on SAPSO
    Yi, Min
    Mo, Li
    Shen, Qin
    [J]. JOURNAL OF COASTAL RESEARCH, 2020, : 371 - 378
  • [22] Long-Term Generation Scheduling for Cascade Hydropower Plants Considering Price Correlation between Multiple Markets
    Luo, Bin
    Miao, Shumin
    Cheng, Chuntian
    Lei, Yi
    Chen, Gang
    Gao, Lang
    [J]. ENERGIES, 2019, 12 (12)
  • [23] Hydropower Plants Cascade - Modeling of Short and Long-Term Management
    Stojanovic, Z.
    Vukosavic, D.
    Divac, D.
    Milivojevic, N.
    Vuckovic, D.
    [J]. JOURNAL OF THE SERBIAN SOCIETY FOR COMPUTATIONAL MECHANICS, 2009, 3 (01) : 210 - 227
  • [24] Influence of Cascade Hydropower Development on Water Quality in the Middle Jinsha River on the Upper Reach of the Yangtze River
    Xu, Tianbao
    Chang, Fengqin
    He, Xiaorong
    Yang, Qingrui
    Ma, Wei
    [J]. WATER, 2022, 14 (12)
  • [25] Long-term risk dispatching of cascaded hydropower stations in electricity market
    Ma, Chao
    Lian, Jijian
    [J]. 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 73 - 77
  • [26] Evaluating the marginal utility principle for long-term hydropower scheduling
    Zhao, Tongtiegang
    Zhao, Jianshi
    Liu, Pan
    Lei, Xiaohui
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2015, 106 : 213 - 223
  • [27] Medium Term Subsection Robust Optimal Scheduling Method of Cascade Hydropower Stations Considering Timeshare Contract
    Yang, Rui
    Li, Gang
    Lu, Jia
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2023, 43 (04): : 1481 - 1491
  • [28] Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm
    Xie, Wei
    Ji, Chang-ming
    Yang, Zi-jun
    Zhang, Xiao-xing
    [J]. WATER SCIENCE AND ENGINEERING, 2012, 5 (01) : 46 - 58
  • [29] Long-Term Scheduling of Provincial Power Grid With Rich Hydropower
    Cao, Rui
    Shen, Jian-Jian
    Chen, Fu
    Cheng, Chun-Tian
    Wang, Jian
    [J]. WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: INTERNATIONAL PERSPECTIVES, HISTORY AND HERITAGE, EMERGING TECHNOLOGIES, AND STUDENT PAPERS, 2017, : 476 - 489
  • [30] Mid-term scheduling and trading decisions for cascade hydropower stations considering multiple variable uncertainties
    Lu, Jia
    Liu, Yaxin
    Cao, Hui
    Xu, Yang
    Ma, Haoyu
    Zhang, Zheng
    Wang, Tao
    Yang, Yuqi
    [J]. FRONTIERS IN ENERGY RESEARCH, 2023, 11