共 50 条
- [25] Analysis of the structural girders of a crane for the license renewal of a BWR Nuclear Power Plant [J]. 3RD INTERNATIONAL CONFERENCE ON STRUCTURAL INTEGRITY (ICSI 2019), 2019, 17 : 115 - 122
- [27] SUBSEQUENT LICENSE RENEWAL IN THE US [J]. ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 7, 2015,
- [29] Regulatory perspectives of license renewal [J]. NUCLEAR ENGINEERING AND DESIGN, 1998, 181 (1-3) : 247 - 250
- [30] License renewal in the United States [J]. NUCLEAR INTER JURA 1999 BIENNIAL CONGRESS, PROCEEDINGS, 1999, : 25 - 26