Analysis of the structural girders of a crane for the license renewal of a BWR Nuclear Power Plant

被引:1
|
作者
Cruz Castro, Juan [1 ]
Hernandez Palafox, Edgar [1 ]
Hernandez Gomez, Luis Hector [1 ]
Soto Mendoza, Gilberto [1 ]
Lopez Grijalba, Yunuen [2 ]
Ruiz Lopez, Pablo [3 ]
机构
[1] Inst Politecn Nacl, SEPI ESIME Zacatenco, Unidad Profes Adolfo Lopez Mateos, Edificio 5,Segundo Piso, Mexico City 07738, DF, Mexico
[2] Inst Politecn Nacl, Unidad Interdisciplinaria Profes Ingn, Campus Hidalgo,Carretera Pachuca Actopan Km 1 500, San Agustin Tlaxiaca 42162, Hidalgo, Mexico
[3] Comis Nacl Seguridad Nucl & Salvaguardias, Dr Jose Ma Barragan 779, Mexico City 03020, DF, Mexico
关键词
Time-Limited Aging Analysis; Cumulative Usage Factor; Stress-Life; Fatigue; FATIGUE;
D O I
10.1016/j.prostr.2019.08.016
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the evaluation of the Cumulative Usage Factor (CUF) of the structural girders of an overhead traveling bridge crane. This type of crane is located inside the reactor building of a BWR Nuclear Power Plant. It is important to mention that this analysis complies with the requirements for the renewal of an operating license of a Nuclear Power Plant. The Finite Element Method (FEM) was done with the ANSYS code. The alternating stresses were determined with the equations of Goodman, Gerber, Morrow and Walker. The Miner rule was used to estimate the CUF projected to 60 years. The results showed two critical cases in the bridge girders. These are the test of the crane at the end of an outage and the handling of waste casks. The CUF was calculated for 60 years of operation and its range is between 0.003 to 0.016. This complies with the 10 CFR 54.21 (c) (1) (ii) standard. It shows that the CUF remains less than one. This ensures that the integrity of the structural girders is maintained during an extended period of the operating license. (C) 2019 The Authors. Published by Elsevier B.V.
引用
收藏
页码:115 / 122
页数:8
相关论文
共 50 条
  • [1] Safety Regulation of Nuclear Power Plant License Renewal
    Zhang, Qiaoe
    Liu, Ting
    Qi, Yuan
    Yang, LiLi
    [J]. 2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
  • [2] NUCLEAR PLANT LICENSE RENEWAL STATUS IN THE US
    Young, Garry G.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2012, VOL 7: OPERATIONS, APPLICATIONS AND COMPONENTS, 2012, : 47 - +
  • [3] Improving IEEE standards for nuclear plant license renewal
    Colaianni, RP
    Horvath, DA
    [J]. 2002 IEEE NUCLEAR SCIENCE SYMPOSIUM, CONFERENCE RECORD, VOLS 1-3, 2003, : 1914 - 1915
  • [4] Human factors, human reliability and risk assessment in license renewal of a nuclear power plant
    Vaurio, Jussi K.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (11) : 1818 - 1826
  • [5] CHALLENGES ASSOCIATED WITH LICENSE RENEWAL FATIGUE EVALUATIONS FOR AN OLDER-VINTAGE BWR PLANT
    Novotny, Tyler D.
    Herrmann, Terry J.
    Mileris, George V.
    Pace, Raymond M.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2010, VOL 7, 2010, : 173 - 179
  • [6] MRP-227/228 component inspections supporting nuclear power plant license renewal
    Renshaw, J.
    Thigpen, B.
    Breza, J.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2013, 74 : 569 - 573
  • [7] OPERATING NUCLEAR PLANT LICENSE RENEWAL PROGRAM STATUS AND TRENDS
    Young, Garry G.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE (PVP-2011), VOL 7, 2012, : 15 - 18
  • [8] Dynamic analysis of hook block for polar crane in nuclear power plant
    Qi, Zhaohui
    Song, Huitao
    [J]. JOURNAL OF VIBROENGINEERING, 2017, 19 (05) : 3895 - 3910
  • [9] Challenges Associated With License Renewal Fatigue Evaluations for an Older-Vintage BWR Plant (Part 2)
    Pace, Raymond M.
    Mogolesko, Fred J.
    Herrmann, Terry J.
    Mileris, George
    Gustin, Harry L.
    Novotny, Tyler
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE (PVP-2011), VOL 7, 2012, : 19 - +
  • [10] License renewal - an idea whose time has come. Hatch Nuclear Plant License Renewal Program: an actual example of application of the license renewal rule to the Intake Structure
    Chandiwala, F
    Evans, WP
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1999, 192 (2-3) : 351 - 363