Behavioural analysis of a hydroelectric production power plant under reworking scheme

被引:8
|
作者
Manglik, Monika [1 ]
Ram, Mangey [1 ]
机构
[1] Graph Era Univ, Dept Math, Dehra Dun, India
关键词
sensitivity; hydroelectric production power plant; reliability indices; electric power; Markov model; RELIABILITY-ANALYSIS; SYSTEM RELIABILITY; FAILURE; OPTIMIZATION; PERFORMANCE; GENERATION;
D O I
10.1080/00207543.2014.962114
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
By high calibre of the fundamental nature of electric power, both of our economic and personal interests, a system is expected to supply as electrical energy as possible with the highest degree of quality and reliability. This research work aimed to evaluate the reliability measures of a hydroelectric power station. The results of this study are deliberate to provide the improved criteria for upcoming proposals, and serves as a basis for generation expansion planning of hydroelectric power stations. This paper presents a Markov-process based mathematical model for a hydroelectric power plant. The important reliability measures have been derived and discussed with the help of failure and repair rates through the analysis. This research gives a clear view of how the hydropower plants are modelled by defining the states under the failure and repair rates.
引用
收藏
页码:648 / 664
页数:17
相关论文
共 50 条
  • [1] Sensitivity analysis of a hydroelectric production power plant under reworking scheme using fuzzy AHP approach
    Ram, Mangey
    Chandna, Ritu
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (08) : 481 - 485
  • [2] Energy production and sustainability: A study of Belo Monte hydroelectric power plant
    Berchin, Issa Ibrahim
    Garcia, Jessica
    Heerdt, Mauri Luiz
    Moreira, Angelica de Quevedo
    Medeiros da Silveira, Ana Clara
    Osorio de Andrade Guerra, Jose Baltazar Salgueirinho
    NATURAL RESOURCES FORUM, 2015, 39 (3-4) : 224 - 237
  • [3] Analysis of synchronous and induction generators used at hydroelectric power plant
    Dinis, C. M.
    Popa, G. N.
    Iagar, A.
    INTERNATIONAL CONFERENCE ON APPLIED SCIENCES (ICAS2016), 2017, 163
  • [4] Failure analysis of a run-of-the-river hydroelectric power plant
    Teran, L. A.
    Roa, C. V.
    Munoz-Cubillos, J.
    Aponte, R. D.
    Valdes, J.
    Larrahondo, F.
    Rodriguez, S. A.
    Coronado, J. J.
    ENGINEERING FAILURE ANALYSIS, 2016, 68 : 87 - 100
  • [5] LAKE DELIO PUMPED-STORAGE HYDROELECTRIC PLANT AND POWER PRODUCTION IN ITALY
    BARONCIN.G
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1971, PA90 (05): : 2108 - &
  • [6] Hydroelectric power plant on a paper strip
    Das, Sankha Shuvra
    Kar, Shantimoy
    Anwar, Tarique
    Saha, Partha
    Chakraborty, Suman
    LAB ON A CHIP, 2018, 18 (11) : 1560 - 1568
  • [7] Experimental Investigations of a Hydroelectric Power Plant
    Ioan, Deaconu Sorin
    Nicolae, Popa Gabriel
    Daniela, Cuntan Corina
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE AND EXPOSITION ON ELECTRICAL AND POWER ENGINEERING (EPE 2016), 2016, : 529 - 534
  • [8] Advanced Control of a Hydroelectric Power Plant
    Unguresan, Mihaela-Ligia
    Muresan, Vlad
    Abrudean, Mihail
    Valean, Honoriu
    Clitan, Julia
    Bondici, Cristian
    Puscasiu, Adela
    Fanca, Alexandra
    Stan, Ovidiu
    2017 21ST INTERNATIONAL CONFERENCE ON SYSTEM THEORY, CONTROL AND COMPUTING (ICSTCC), 2017, : 358 - 365
  • [9] ON THE APPLICATION OF FUNCTIONAL-ANALYSIS TO THE OPTIMIZATION OF THE PRODUCTION OF HYDROELECTRIC POWER
    CHRISTENSEN, GS
    SOLIMAN, SA
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (04) : 841 - 847