An extension of the model for the problem of workpiece scheduling in a flexible manufacturing cell

被引:1
|
作者
Teixeira, E [1 ]
Mendes, A [1 ]
机构
[1] Fundacao Ctr Tecnol Informat, Inst Automacao, BR-13081970 Campinas, SP, Brazil
关键词
flexible manufacturing cell; mathematical programming; tools; scheduling;
D O I
10.1080/095372898234398
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an extension to the 1993 model presented by Teixeira for scheduling workpieces in a flexible manufacturing cell (FMC). In that case, Teixeira modelled the problem as a mixed-integer linear program (MILP) and introduced a robot as the transport device for the workpieces. The extension consists in considering that each job requires a set of different tools to be executed and that the FMC's central tool magazine is loaded with one tool of each type. This approach is interesting when one considers the case of tools being so expensive that it is preferable to increase the production length rather than buy additional tooling. A small example problem is solved and the resulting Gantt charts are shown.
引用
收藏
页码:176 / 180
页数:5
相关论文
共 50 条
  • [1] Extension of the model for the problem of workpiece scheduling in a flexible manufacturing cell
    Fundacao Centro Tecnologico para, Informatica, Campinas, Brazil
    Prod Plann Control, 2 (176-180):
  • [2] Flexible robotic manufacturing cell scheduling problem with multiple robots
    Yang, Yujun
    Chen, Ye
    Long, Chuanze
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) : 6768 - 6781
  • [3] GROUPING PROBLEM IN SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    KUSIAK, A
    VANNELLI, A
    KUMAR, KR
    ROBOTICA, 1985, 3 (OCT-) : 245 - 252
  • [4] A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
    Fattahi, Parviz
    Hosseini, Seyed Mohammad Hassan
    Jolai, Fariborz
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (5-8): : 787 - 802
  • [5] A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
    Parviz Fattahi
    Seyed Mohammad Hassan Hosseini
    Fariborz Jolai
    The International Journal of Advanced Manufacturing Technology, 2013, 65 : 787 - 802
  • [6] WORKPIECES SCHEDULING IN A FLEXIBLE MANUFACTURING CELL
    TEIXEIRA, E
    YAMAKAMI, A
    PRODUCTION MANAGEMENT METHODS, 1994, 19 : 217 - 224
  • [7] A note on “A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem”
    Hongying Shan
    Tsui-Ping Chung
    LuLu Hu
    The International Journal of Advanced Manufacturing Technology, 2014, 74 : 819 - 822
  • [8] A note on "A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem"
    Shan, Hongying
    Chung, Tsui-Ping
    Hu, LuLu
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 74 (5-8): : 819 - 822
  • [9] GROUP SCHEDULING PROBLEM - KEY TO FLEXIBLE MANUFACTURING SYSTEMS
    LOGENDRAN, R
    COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 23 (1-4) : 113 - 116