Multiobjective Robust Power System Expansion Planning Considering Generation Units Retirement

被引:31
|
作者
Mavalizadeh, Hani [1 ]
Ahmadi, Abdollah [2 ]
Gandoman, Foad Haidari [3 ]
Siano, Pierluigi [4 ]
Shayanfar, Heidar Ali [1 ]
机构
[1] Iran Univ Sci & Technol, Ctr Excellence Power Syst Automat & Operat, Sch Elect Engn, Tehran 1465813318, Iran
[2] Univ New South Wales, Australian Energy Res Inst, Sch Elect Engn & Telecommun, Sydney, NSW 2052, Australia
[3] Free Univ Brussels, Res Grp MOBI Mobil Logist & Automot Technol Res C, B-1050 Brussels, Belgium
[4] Univ Salerno, Dept Ind Engn, I-84084 Salerno, Italy
来源
IEEE SYSTEMS JOURNAL | 2018年 / 12卷 / 03期
关键词
Generation expansion planning; information-gap decision theory; mixed-integer linear programming; normal boundary intersection; transmission expansion planning; BOUNDARY INTERSECTION METHOD; DECISION-MAKING FRAMEWORK; ELECTRICITY RETAILER; TRANSMISSION; EMISSION;
D O I
10.1109/JSYST.2017.2672694
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a mixed-integer linear robust multiobjective model for the expansion planning of an electric power system. An information-gap decision theory-based framework is proposed to take into account the uncertainties in electrical demand and new power system elements prices. The model is intended to increase the power system resistance against the uncertainties caused by forecast errors. The normal boundary intersection method is used to obtain the Pareto front of the multiobjective problem. Since the planning problem is a large-scale problem, the model is kept linear using the Big M linearization technique that is able to significantly decrease the computational burden. The fuel transportation and availability constraints are taken into account. The model also enables the system planner to build new fuel transportation routes whenever it is necessary. The generating units' retirement is also incorporated into the model, and the simulation results are showed to the advantages of incorporating units' retirement in the power system expansion planning model instead of considering it separately. The proposed multiobjective method is applied to the Garver 6-bus, IEEE 24-bus, and IEEE 118-bus test systems, and the results are compared with the well-known epsilon-constraint method.
引用
收藏
页码:2664 / 2675
页数:12
相关论文
共 50 条
  • [21] Multi-stage Low-carbon Power System Planning Considering Generation Retirement and R retrofit
    Shen, Wei
    Chen, Xi
    Meng, Ke
    Dong, Zhao Yang
    Qiu, Jing
    [J]. 2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [22] Composite power system expansion planning considering outage cost
    Choi, Jaeseok
    Tran, Trungtinh
    Mount, T. D.
    Thomas, R.
    [J]. 2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 2958 - +
  • [23] Power Generation and Transmission Expansion Planning under Uncertainty considering Flexibility in Generation Investments
    Arevalo, Mario
    Rios, Daniel
    Baum, Gabriel
    Blanco, Gerardo
    [J]. 2017 CONGRESO INTERNACIONAL DE INNOVACION Y TENDENCIAS EN INGENIERIA (CONIITI), 2017,
  • [24] Robust Expansion Planning of Transmission Network Considering Extreme Scenario of Wind Power
    Liang Z.
    Chen H.
    Zheng X.
    Wang X.
    Chen S.
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (16): : 58 - 67
  • [25] Dynamic generation and transmission expansion planning in the power market-based on a multiobjective framework
    Khakpoor, Mostaan
    Jafari-Nokandi, Meysam
    Abdoos, Ali Akbar
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2017, 27 (09):
  • [26] Multiobjective transmission expansion planning considering security and demand uncertainty
    Bolanos Ocampo, Ricardo Andres
    Correa Florez, Carlos Adrian
    Escobar Zuluaga, Antonio Hernando
    [J]. INGENIERIA E INVESTIGACION, 2009, 29 (03): : 74 - 78
  • [27] Stochastic Flexible Power System Expansion Planning, Based on the Demand Response Considering Consumption and Generation Uncertainties
    Moghadam, Ali Toolabi
    Bahramian, Bahram
    Shahbaazy, Farid
    Paeizi, Ali
    Senjyu, Tomonobu
    [J]. SUSTAINABILITY, 2023, 15 (02)
  • [28] Integrated generation-transmission expansion planning considering power system reliability and optimal maintenance activities
    Mahdavi, Meisam
    Javadi, Mohammad S.
    Catalao, Joao P. S.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 145
  • [29] Reliability-Constrained Robust Power System Expansion Planning
    Dehghan, Shahab
    Amjady, Nima
    Conejo, Antonio J.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) : 2383 - 2392
  • [30] Generation expansion and retirement planning based on the stochastic programming
    Tohidi, Yaser
    Aminifar, Farrokh
    Fotuhi-Firuzabad, Mahmud
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2013, 104 : 138 - 145