Integrated generation-transmission expansion planning considering power system reliability and optimal maintenance activities

被引:18
|
作者
Mahdavi, Meisam [1 ]
Javadi, Mohammad S. [2 ]
Catalao, Joao P. S. [2 ,3 ]
机构
[1] Sao Paulo State Univ, Sch Engn, Associated Lab Ilha Solteira, Bioenergy Res Inst IPBEN, BR-15385000 Ilha Solteira, SP, Brazil
[2] Inst Syst & Comp Engn Technol & Sci INESC TEC, Porto, Portugal
[3] Univ Porto, Fac Engn, Porto, Portugal
关键词
Generation and transmission reliability; Lines loading; Repair; Maintenance; Power-system expansion planning; DEMAND RESPONSE; ROBUST; UNCERTAINTY; RESOURCES;
D O I
10.1016/j.ijepes.2022.108688
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper evaluates lines repair and maintenance impacts on generation-transmission expansion planning (GTEP), considering the transmission and generation reliability. The objective is to form a balance between the transmission and generation expansion and operational costs and reliability, as well as lines repair and main-tenance costs. For this purpose, the transmission system reliability is represented by the value of loss of load (LOL) and load shedding owing to line outages, and generation reliability is formulated by the LOL and load shedding indices because of transmission congestion and outage of generating units. The implementation results of the model on the IEEE RTS show that including line repair and maintenance as well as line loading in GTEP leads to optimal generation and transmission plans and significant savings in expansion and operational costs.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] Transmission and Generation Expansion Planning Considering System Reliability and Line Maintenance
    Mahdavi, Meisam
    Macedo, Leonardo H.
    Romero, Ruben
    [J]. 26TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE 2018), 2018, : 1005 - 1010
  • [2] Imprecise reliability assessment of composite generation-transmission system considering interval probability
    Qi, Xianjun
    Wang, Xingqiang
    Huang, Xiangyu
    [J]. Dianwang Jishu/Power System Technology, 2014, 38 (05): : 1203 - 1209
  • [3] Integrated generation-transmission expansion planning for offshore oilfield power systems based on genetic Tabu hybrid algorithm
    Dawei SUN
    Xiaorong XIE
    Jianfeng WANG
    Qiang LI
    Che WEI
    [J]. Journal of Modern Power Systems and Clean Energy, 2017, 5 (01) : 117 - 125
  • [4] Reliability-constrained dynamic transmission expansion planning considering wind power generation
    A. N. de Paula
    E. J. de Oliveira
    L. W. Oliveira
    C. A. Moraes
    [J]. Electrical Engineering, 2020, 102 : 2583 - 2593
  • [5] Reliability-constrained dynamic transmission expansion planning considering wind power generation
    de Paula, A. N.
    de Oliveira, E. J.
    Oliveira, L. W.
    Moraes, C. A.
    [J]. ELECTRICAL ENGINEERING, 2020, 102 (04) : 2583 - 2593
  • [6] Integrated generation-transmission expansion planning for offshore oilfield power systems based on genetic Tabu hybrid algorithm
    Sun, Dawei
    Xie, Xiaorong
    Wang, Jianfeng
    Li, Qiang
    Wei, Che
    [J]. JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2017, 5 (01) : 117 - 125
  • [7] Integrated Generation & Transmission Planning and System Expansion
    Chowdhury, Ali
    Le, David
    [J]. 2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 1970 - 1974
  • [8] Analysis of the Reliability of Electrical Power Generation-Transmission Network
    Bousshoua, Bouziane
    Elmaouhab, Ali
    Chehri, Amine
    [J]. PROCEEDINGS 2018 3RD INTERNATIONAL CONFERENCE ON ELECTRICAL SCIENCES AND TECHNOLOGIES IN MAGHREB (CISTEM), 2018, : 982 - 986
  • [9] Integrated transmission and generation expansion planning considering safety constraints
    Saldarriaga-Zuluaga, Sergio D.
    López-Lezama, Jesús M.
    Muñoz-Galeano, Nicolás
    [J]. Informacion Tecnologica, 2018, 29 (03): : 167 - 176
  • [10] Optimal Transmission Expansion Planning Considering the Uncertainties of the Power Market
    Bae, In-Su
    Son, Min-Kyun
    Kim, Jin-O
    [J]. JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2010, 5 (02) : 239 - 245