共 50 条
- [42] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM PFG-JOURNAL OF PHOTOGRAMMETRY REMOTE SENSING AND GEOINFORMATION SCIENCE, 2017, 85 (01): : 3 - 15
- [43] RESEARCH ON BIM-BASED 4D SIMULATION CONSTRUCTION MANAGEMENT OF SUBWAY STATION WITH PBA METHOD CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 45 - 49
- [44] 4D BIM integrated optimization of construction steel bar procurement plan for limited storage capacity CONSTRUCTION INNOVATION-ENGLAND, 2024,
- [45] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science, 2017, 85 : 3 - 15
- [47] ON THE USE OF OPEN BIM AND 4D VISUALISATION IN A PREDICTIVE LIFE CYCLE MANAGEMENT SYSTEM FOR CONSTRUCTION WORKS JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2011, 16 : 445 - 465
- [50] Construction management pull for 4D CAD CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 977 - 983