Calibration of initial cable forces in cable-stayed bridge based on Kriging approach

被引:28
|
作者
Zhang, J. [1 ,2 ]
Au, F. T. K. [1 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
[2] Hefei Univ Technol, Dept Civil Engn, Hefei, Anhui, Peoples R China
关键词
Baseline model; Cable-stayed budges; Initial cable force adjustment; Kriging model; Surrogate model; DESIGN OPTIMIZATION;
D O I
10.1016/j.finel.2014.08.007
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Although optimization methods are useful in the preliminary design of cable stayed bridges for sizing of components and getting optimal bridge configurations, further fine-tuning is invariably conducted in the detailed design thus affecting various sensitive properties such as the deck profile and cable forces. The zero-displacement method that adjusts the initial cable lengths repeatedly to achieve the design deck profile is both computationally intensive and prone to convergence difficulty. Therefore a calibration method is proposed based on a Kriging surrogate model built using the uniform design approach. Apart from establishing the relationship between the bridge deck geometry and the initial cable forces by statistical method, the Kriging model also obviates the need for a large number of repeated finite element analyses. A simple cable-stayed bridge is used to verify the feasibility and accuracy of the proposed method. In real-life cable-stayed bridges with many cables, a staged calibration is implemented so that the Kriging model is used to identify reasonable initial forces in the critical stay cables so that the zero-displacement method or similar can be used for further adjustments. Verification shows that this staged calibration can address not only the deck level tolerance but also the control of cable forces. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:80 / 92
页数:13
相关论文
共 50 条
  • [31] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI
    不详
    WELDING DESIGN & FABRICATION, 1984, 57 (06): : 67 - 70
  • [32] JAPANESE CABLE-STAYED BRIDGE DESIGN
    BURDEN, AR
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 1021 - 1051
  • [33] DYNAMIC BEHAVIOR OF A CABLE-STAYED BRIDGE
    FLEMING, JF
    EGESELI, EA
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1980, 8 (01): : 1 - 16
  • [34] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    Better Roads, 2004, 74 (02): : 94 - 97
  • [35] OPERATION AND MAINTENANCE OF CABLE-STAYED BRIDGE
    Tian Chunyan
    Yang Shengchao
    Zhang Na
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1059 - +
  • [36] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [37] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [38] Optimization of Construction Process and Determination of Intermediate Cable Forces for Composite Beam Cable-Stayed Bridge
    Huang, Ersen
    Ke, Hongjun
    Hu, Huanhuan
    APPLIED SCIENCES-BASEL, 2023, 13 (09):
  • [39] Basarab Cable-Stayed Bridge in Bucharest
    Manterola Armisen, Javier
    Martinez Cutillas, Antonio
    Fuente Garcia, Silvia
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 392 - 395
  • [40] FOUNDATIONS OF THE ANNACIS CABLE-STAYED BRIDGE
    BAZETT, DJ
    MCCAMMON, NR
    CANADIAN GEOTECHNICAL JOURNAL, 1986, 23 (04) : 458 - 471