Assessment of performance indices of selected gas turbine power plants in Nigeria

被引:11
|
作者
Oyedepo, Sunday Olayinka [1 ]
Fagbenle, Richard Olayiwola [2 ]
Adefila, Samuel Sunday [3 ]
机构
[1] Covenant Univ, Dept Mech Engn, Ota, Nigeria
[2] Obafemi Awolowo Univ, Dept Mech Engn, Ife, Nigeria
[3] Covenant Univ, Dept Chem Engn, Ota, Nigeria
来源
ENERGY SCIENCE & ENGINEERING | 2015年 / 3卷 / 03期
关键词
Availability; electricity; performance indices; plant factor; power plant; reliability; RELIABILITY;
D O I
10.1002/ese3.61
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this study, performance assessment of selected gas turbine power plants in Nigeria was evaluated using performance indices. The results of the study showed that for the period under review (2006-2010), the percentage shortfalls from the target energy in the selected power plants range from 26.33% to 86.61% as against the acceptable value of 5-10%. The capacity factor of the selected power plants varies from 16.88% to 73.67% as against the international value of 50-80%. The plant use factor varies from 45.89% to 97.03% and the utilization factor varies from 6.31% to 93.074% as against the international best practice of over 95%. From this result, it can be concluded that the generating units were underutilized. This is due to inadequate routine maintenance and equipment fault development. The analyses of reliability indicators revealed that the mean time between failures varies from 5.42 to 378.44 h, the mean time to repair varies from 18.3 to 153.88 h and the plant availability varies from 12.86% to 91.31% as against the Institute of Electrical and Electronics Engineers recommended standard of 99.9%. Evaluation of operating figures of the selected power plants revealed that starting reliability (SR) and operating reliability vary from 71.95% to 93.9% and 5.33% to 55%, respectively. The SR of the selected power plants is low in value compared with standard value of 99.9%. The statistical analysis carried out on plant availability revealed that at 95% confidence level; there is a significant difference in availability of the selected power plants. This indicates differences in their systems installation, operation and maintenance. The performance indicator developed to evaluate the performance indices for the selected stations can also be applicable to other power stations in Nigeria and elsewhere. Measures to improve the performance indices of the plants have been suggested in this paper.
引用
收藏
页码:239 / 256
页数:18
相关论文
共 50 条
  • [21] Fuzzy control in gas turbine power plants
    Guo, Xia
    Liu, Shangming
    Wei, Siliang
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2000, 40 (11): : 30 - 34
  • [22] INDUSTRIAL NUCLEAR GAS TURBINE POWER PLANTS
    BAMMERT, K
    BUNDE, R
    ATOMKERNENERGIE, 1968, 13 (05): : 381 - &
  • [23] Exergoeconomic Analysis of Gas Turbine Power Plants
    Gorji-Bandpy, Mofid
    Ebrabimian, Vahid
    INTERNATIONAL ENERGY JOURNAL, 2006, 7 (01): : 35 - 41
  • [24] GAS-TURBINE NUCLEAR POWER PLANTS
    KATTERHE.AA
    REACTOR TECHNOLOGY, 1969, 13 (01): : 7 - &
  • [25] Assessment of Thermoelectric Cooling Application to Improve Power Gas Turbine Performance
    Galibut, William A.
    Tayactac, Reylina G.
    2024 15TH INTERNATIONAL CONFERENCE ON MECHANICAL AND INTELLIGENT MANUFACTURING TECHNOLOGIES, ICMIMT 2024, 2024, : 40 - 45
  • [26] ASSESSMENT OF GAS TURBINE AND COMBINED CYCLE POWER PLANT PERFORMANCE DEGRADATION
    Hepperle, Nina
    Therkorn, Dirk
    Schneider, Ernst
    Staudacher, Stephan
    PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 4, 2012, : 569 - 577
  • [27] TECHNOLOGY READINESS ASSESSMENT OF THERMAL ENERGY STORAGE INTEGRATED WITH GAS TURBINE POWER PLANTS
    Angello, Leonard
    Perullo, Christopher
    Widener, Stanley
    Booras, George
    Prescott, Eric
    PROCEEDINGS OF ASME TURBO EXPO 2024: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, GT2024, VOL 6, 2024,
  • [28] PERFORMANCE ANALYSES OF GAS TURBINE COGENERATION PLANTS
    Karaali, Rabi
    Ozturk, Ilhan Tekin
    ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2017, 37 (01) : 25 - 33
  • [29] Power Plants with Underground Gas Storage: Air-Storage Gas Turbine Power Plants.
    Lehmann, Jochen
    Elektrotechnika Budapest, 1984, 77 (10-11): : 342 - 350
  • [30] PROSPECTS FOR USING GAS-TURBINE AND STEAM TURBINE-GAS TURBINE PLANTS IN POWER INDUSTRY
    OLKHOVSKII, GT
    VOLKOVA, EA
    DLUGOSELSKII, VI
    FEOKTISTOV, LF
    THERMAL ENGINEERING, 1974, 21 (03) : 1 - 6