共 50 条
- [22] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies Tsinghua Science and Technology, 2008, 13 (SUPPL. 1): : 241 - 247
- [24] Critical issues in the development of 4D CAD for construction project planning CONCURRENT ENGINEERING: ADVANCED DESIGN, PRODUCTION AND MANAGEMENT SYSTEMS, 2003, : 893 - 897
- [25] Application on secure communication and general synchronization of a new 4-D hyperchaotic system INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEMS II, PTS 1-3, 2013, 336-338 : 1781 - 1785
- [29] Utilization of 2D, 3D, or 4D CAD in construction communication documentation FIFTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALISATION, PROCEEDINGS, 2001, : 219 - 224
- [30] New 4-D imaging for real-time intraoperative MRI: Adaptive 4-D scan MEDICAL IMAGE COMPUTING AND COMPUTER-ASSISTED INTERVENTION - MICCAI 2006, PT 1, 2006, 4190 : 454 - 461