Application of 4-D CAD in the construction workplace

被引:0
|
作者
Coble, RJ [1 ]
Theisen, D [1 ]
Blatter, RL [1 ]
机构
[1] Univ Florida, Sch Bldg Construct, Gainesville, FL 32611 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4-D CAD is a powerful tool for construction managers. It is also a tool that can be used at the foreman level. The concept of requiring foreman to equate three-dimensional drawings with time should be the goal of every construction manager. Time is the basis on which contracts are awarded, disputes originate, and the projects success is judged. A foreman must understand the intent and end result of a segment before it can be constructed. If the foreman can be helped through this process with visualization tools, the issue becomes one of cost versus value analysis. Current computer technology is making its way into the hands of foreman through the use of portable computers, PDA's, and wireless communications. The acceptance of computer technology by foreman is on the rise with many companies making it a requirement for employment. This acceptance is what makes 4-D CAD desirable for field application in the construction industry.
引用
收藏
页码:984 / 989
页数:2
相关论文
共 50 条
  • [11] Construction schedule simulation and its application to hydrojunctions of water diversion project based on 4D CAD
    Zhong, DH
    Liu, JM
    Fu, JQ
    Xiong, KZ
    SYSTEM SIMULATION AND SCIENTIFIC COMPUTING, VOLS 1 AND 2, PROCEEDINGS, 2005, : 400 - 405
  • [12] On dynamics of 4-D blinking chaotic system and voice encryption application
    Elsadany, A. A.
    Hussein, Sarbast
    Al-khedhairi, A.
    Elsonbaty, Amr
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 70 : 701 - 718
  • [13] Application of the quasi-inverse method to accelerate 4-D VAR
    Kalnay, E
    Pu, ZX
    12TH CONFERENCE ON NUMERICAL WEATHER PREDICTION, 1998, : 41 - 42
  • [14] 4-D SPHERE SOLVED
    DEVLIN, K
    NEW SCIENTIST, 1983, 99 (1374) : 715 - 715
  • [15] 4-D Photoacoustic Tomography
    Liangzhong Xiang
    Bo Wang
    Lijun Ji
    Huabei Jiang
    Scientific Reports, 3
  • [16] 4-D Photoacoustic Tomography
    Xiang, Liangzhong
    Wang, Bo
    Ji, Lijun
    Jiang, Huabei
    SCIENTIFIC REPORTS, 2013, 3
  • [17] Attitudes to 3D and 4D CAD systems in the Australian construction industry
    Saha, S
    Hardie, M
    Jeary, A
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 1973 - 1977
  • [18] Infantile language in 4-D
    Switalsio, Silvia
    ZEITSCHRIFT FUR ROMANISCHE PHILOLOGIE, 2007, 123 (04): : 648 - 652
  • [19] FILMING THE INVISIBLE IN 4-D
    Zewail, Ahmed H.
    SCIENTIFIC AMERICAN, 2010, 303 (02) : 74 - 81
  • [20] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies
    张建平
    张洋
    胡振中
    鹿明
    TsinghuaScienceandTechnology, 2008, (S1) : 241 - 247