Analysis on the excavation management system of slurry shield TBM in permeable sandy ground

被引:11
|
作者
Tang, Shao-Hu [1 ,2 ]
Zhang, Xiao-Ping [1 ,2 ]
Liu, Quan-Sheng [1 ,2 ]
Xie, Wei-Quag [1 ,2 ]
Yang, Xin-Mei [1 ,2 ]
Chen, Peng [3 ]
Tu, Xin-Bin [4 ]
机构
[1] Wuhan Univ, Key Lab Safety Geotech & Struct Engn Hubei Prov, Sch Civil Engn, Wuhan 430072, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[3] China Railway 14th Bur Grp Shield Engn Co Ltd, Nanjing 211800, Peoples R China
[4] State Grid Econ & Technol Res Inst Co Ltd, Beijing 102209, Peoples R China
基金
中国国家自然科学基金;
关键词
Slurry shield TBM; Excavation management system; Permeable sandy ground; Calculation method; YANGTZE-RIVER TUNNEL; MODEL TEST; STABILITY ANALYSIS; FACE STABILITY; CONSTRUCTION; INFILTRATION; PREDICTION; PARAMETERS; MECHANISM; LININGS;
D O I
10.1016/j.tust.2021.103935
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Slurry shield TBMs with full-face mechanized excavation and active face support using slurry suspension are increasingly being employed for the construction of underwater tunnels. When tunneling in permeable sandy ground, the choice of suitable excavation management system and volume calculation method is extremely important to prevent security emergencies such as face collapse, water inflow and ground deformation. However, this subject has not attracted adequate attention in previous studies. Until now, there is still a lack of reliable methods to calculate geomaterials excavated from the tunnel face in permeable sandy ground. In the present study, shortcomings of traditional calculation method have been analyzed. Improved calculation method considering the effect of slurry filtration loss and ground water displacement has been proposed to evaluate the performance of excavation management system in permeable sandy ground. A case study of Sutong GIL Yangtze River Crossing Cable Tunnel has been carried out. The results indicate that the calculation error based on the improved method is smaller than that based on the traditional method. The improved method is much more suitable for permeable sandy ground.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Discrete-Element Analysis of the Excavation Performance of an EPB Shield TBM under Different Operating Conditions
    Park, Byungkwan
    Lee, Chulho
    Choi, Soon-Wook
    Kang, Tae-Ho
    Chang, Soo-Ho
    APPLIED SCIENCES-BASEL, 2021, 11 (11):
  • [32] A new evaluation method to quantify the wear failure of irregular cutting tool during shield TBM tunneling in abrasive sandy ground
    Tang, Shao-Hui
    Zhang, Xiao-Ping
    Xie, Wei-Qiang
    Liu, Quan-Sheng
    Wu, Jian
    Chen, Peng
    ENGINEERING FAILURE ANALYSIS, 2023, 146
  • [33] Prediction and analysis of slurry shield TBM disc cutter wear and its application in cutter change time
    Shen, Xiang
    Chen, Xiangsheng
    Fu, Yanbin
    Cao, Chengyong
    Yuan, Dajun
    Li, Xuhui
    Xiao, Yongsheng
    WEAR, 2022, 498
  • [34] Feedforward Analysis for Shield-Ground System
    Ding, Lieyun
    Wang, Fan
    Luo, Hanbin
    Yu, Minghui
    Wu, Xianguo
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2013, 27 (03) : 231 - 242
  • [35] Stability Analysis of Shield Excavation Face Based on Particle Flow in Different Depths of Sandy Gravel Stratum
    Zhang Junwei
    Huang Ling
    Peng Taixin
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [36] Analysis of flow field characteristics and factors influencing the excavation chamber in large-diameter slurry shield
    Xia, Yimin
    Xiao, Hongwan
    Chen, Peng
    Yang, Minqiang
    Xiao, Xuemeng
    Zhou, Zixiong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 152
  • [37] Disturbance Process of Sandy Gravel Stratum Caused by Shield Tunneling and Ground Settlement Analysis
    Qingke, Nie
    Guang, Sun
    Siyuan, Gao
    Hongtao, Liu
    Lichao, Zhou
    Jianpeng, Hou
    FRONTIERS IN EARTH SCIENCE, 2021, 9
  • [38] CONTROL OF THE SOIL REGIMES OF PERMEABLE SANDY SOILS BY A SYSTEM OF GROUND LEAK-PROOF TROUGHS
    LHOTSKY, J
    STACH, J
    NEMEC, J
    EHRLICH, P
    VACHAL, J
    ROSTLINNA VYROBA, 1981, 27 (05): : 553 - 560
  • [39] Determination of the system behaviour based on data analysis of a hard rock shield TBM
    Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins-Schildvortrieb
    1600, Ernst und Sohn (07):
  • [40] Upper Bound Limit Analysis of Limit Support Pressure for Shield Excavation Face in Composite Ground
    Dai Z.
    Hu Z.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2021, 53 (02): : 95 - 102