Analysis on the excavation management system of slurry shield TBM in permeable sandy ground

被引:11
|
作者
Tang, Shao-Hu [1 ,2 ]
Zhang, Xiao-Ping [1 ,2 ]
Liu, Quan-Sheng [1 ,2 ]
Xie, Wei-Quag [1 ,2 ]
Yang, Xin-Mei [1 ,2 ]
Chen, Peng [3 ]
Tu, Xin-Bin [4 ]
机构
[1] Wuhan Univ, Key Lab Safety Geotech & Struct Engn Hubei Prov, Sch Civil Engn, Wuhan 430072, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[3] China Railway 14th Bur Grp Shield Engn Co Ltd, Nanjing 211800, Peoples R China
[4] State Grid Econ & Technol Res Inst Co Ltd, Beijing 102209, Peoples R China
基金
中国国家自然科学基金;
关键词
Slurry shield TBM; Excavation management system; Permeable sandy ground; Calculation method; YANGTZE-RIVER TUNNEL; MODEL TEST; STABILITY ANALYSIS; FACE STABILITY; CONSTRUCTION; INFILTRATION; PREDICTION; PARAMETERS; MECHANISM; LININGS;
D O I
10.1016/j.tust.2021.103935
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Slurry shield TBMs with full-face mechanized excavation and active face support using slurry suspension are increasingly being employed for the construction of underwater tunnels. When tunneling in permeable sandy ground, the choice of suitable excavation management system and volume calculation method is extremely important to prevent security emergencies such as face collapse, water inflow and ground deformation. However, this subject has not attracted adequate attention in previous studies. Until now, there is still a lack of reliable methods to calculate geomaterials excavated from the tunnel face in permeable sandy ground. In the present study, shortcomings of traditional calculation method have been analyzed. Improved calculation method considering the effect of slurry filtration loss and ground water displacement has been proposed to evaluate the performance of excavation management system in permeable sandy ground. A case study of Sutong GIL Yangtze River Crossing Cable Tunnel has been carried out. The results indicate that the calculation error based on the improved method is smaller than that based on the traditional method. The improved method is much more suitable for permeable sandy ground.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Model test of excavation face stability of EPB shield in sandy cobble ground and adjacent building effect
    Fan, Zuowen
    Zhang, Zixin
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2013, 32 (12): : 2506 - 2512
  • [22] Analytical methods in predicting excess pore water pressure in front of slurry shield in saturated sandy ground
    Xu, Tao
    Bezuijen, Adam
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 73 : 203 - 211
  • [23] Analysis of Affecting Factors of Ground Deformation Based on Shield Tunnel Excavation
    Li, Lixin
    Zou, Qiyun
    Wang, Junjia
    MACHINERY ELECTRONICS AND CONTROL ENGINEERING III, 2014, 441 : 615 - 618
  • [24] Shield Excavation Analysis: Ground Settlement & Mechanical Responses in Complex Strata
    Qin B.
    Zhang G.
    Zhang W.
    SDHM Structural Durability and Health Monitoring, 2024, 18 (03): : 341 - 360
  • [25] Soil Arch Effect Analysis of Shield Tunnel in Dry Sandy Ground
    Sun, Xiaohao
    Miao, Linchang
    Lin, Haishan
    Tong, Tianzhi
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2018, 18 (06)
  • [26] Three-Dimensional Seepage Flow Analysis of Slurry Shield with Permeable Filter Cake
    Yin, Xinsheng
    Ding, Zhi
    Wei, Xinjiang
    Wei, Gang
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: TUNNELLING AND UNDERGROUND CONSTRUCTION, 2018, : 136 - 155
  • [27] Experimental study on the influences of cutter geometry and material on scraper wear during shield TBM tunnelling in abrasive sandy ground
    Tang, Shaohui
    Zhang, Xiaoping
    Liu, Quansheng
    Zhang, Qi
    Li, Xinfang
    Wang, Haojie
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2024, 16 (02): : 410 - 425
  • [28] Dynamic Modeling and Analysis of Shield TBM Cutterhead Driving System
    Li, Xian Hong
    Yu, Hai Bin
    Yuan, Ming Zhe
    Wang, Jin
    Yin, Yuan
    JOURNAL OF DYNAMIC SYSTEMS MEASUREMENT AND CONTROL-TRANSACTIONS OF THE ASME, 2010, 132 (04): : 1 - 14
  • [29] Analysis of Shield Excavation Face Failure and Tunneling Control with Two Parameters in Sandy Cobble Strata
    Yao Q.
    Zhang R.
    Gong Q.
    Zhou S.
    Tongji Daxue Xuebao/Journal of Tongji University, 2023, 51 (09): : 1407 - 1415
  • [30] Assessing sand sedimentation in drilling slurry using particle methods for ground excavation management
    Nakao, Koki
    Morishita, Tomotaka
    Miura, Toshihiko
    Inazumi, Shinya
    RESULTS IN ENGINEERING, 2024, 22