Work package-based information modeling for resource-constrained scheduling of construction projects

被引:45
|
作者
Wang, Heng-Wei [1 ,2 ]
Lin, Jia-Rui [1 ,2 ]
Zhang, Jian-Ping [1 ,2 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Tsinghua Univ Glodon Joint Res Ctr Bldg Informat, Beijing 100084, Peoples R China
基金
北京市自然科学基金; 国家重点研发计划;
关键词
Information modeling; Data integration; Resource-constrained scheduling; Work package; Constraint programming; Optimization; DIFFERENTIAL EVOLUTION; SERIAL METHOD; BIM; OPTIMIZATION; VISUALIZATION; INTEGRATION; SIMULATION; MANAGEMENT; FRAMEWORK;
D O I
10.1016/j.autcon.2019.102958
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As an essential problem in construction management, the resource-constrained project scheduling problem (RCPSP) has been studied for decades; however, an integrated information model that fully supports the RCPSP solving process is still lacking. Though building information modeling (BIM) was proposed to meet the data requirements in the building life cycle, some scheduling and resource information are not considered in information transfers between the information model and the RCPSP mathematical model. This paper presents an integrated approach that enables fluent data flow from the information model to the RCPSP model for construction scheduling. Within this approach, a work package-based information model is proposed to capture all the required data of the RCPSP. Then, a semiautomatic method that integrates multisource data is introduced to form the proposed information model, and an adaptive data transmission method is used to support a designed multimode resource-constrained project scheduling problem (MRCPSP) model. The models and approaches are validated using the data of an actual project, demonstrating the feasibility and efficiency. This study contributes a novel integrated approach to formalizing a construction information model using a semiautomatic data integration approach, covering the information requirement and enables fluent data flow in the RCPSP solving process. Meanwhile, the work package-based information model is a successful attempt to introduce previously-gained knowledge into automatic schedule generation processes. Future work, such as extending the information model, creating new methods for RCPSP model generation, and data analytics, can bring new opportunities to apply more complex and intelligent methods in project scheduling and construction management.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [2] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [3] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [4] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [5] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [6] Multi-Objective Resource-Constrained Scheduling in Large and Repetitive Construction Projects
    Lazari, Vasiliki
    Chassiakos, Athanasios
    Karatzas, Stylianos
    ALGORITHMS, 2024, 17 (08)
  • [7] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [8] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205
  • [9] Heuristic scheduling of resource-constrained projects with cash flows
    Padman, R
    SmithDaniels, DE
    SmithDaniels, VL
    NAVAL RESEARCH LOGISTICS, 1997, 44 (04) : 365 - 381
  • [10] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    Journal of Global Optimization, 2020, 76 : 211 - 241