Process flow scheduling as a resource-constrained project planning problem

被引:0
|
作者
Trautmann, N [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtsch Theorie & Operat Res, Collegium Schloss 4, D-76128 Karlsruhe, Germany
关键词
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We discuss a project scheduling model for batch scheduling in process industries like chemicals or food industry. The production of Various final products out of different raw materials is achieved by several successive chemical or physical transformation processes on different production stages, e.g. heating, filtration, or packaging. In batch mode production, a given quantity of a substance, called batch, is processed at each production level using multi-purpose equipment. The complexity of the batch scheduling problem is increased by constraints as finite intermediate storage, minimal and maximal time lags that have to be considered between different production steps, sequence dependent cleaning operations, alternative modes for individual production steps, campaign scheduling etc. The objective is to determine a start time and a mode for each production step such that all constraints of the problem are observed and a given goal function is minimized. After an analysis of the problem and objective functions relevant in praxis, we present a deterministic resource-constrained project scheduling model and basic concepts of a solution algorithm.
引用
收藏
页码:491 / 496
页数:6
相关论文
共 50 条
  • [41] A branch and bound algorithm for the resource-constrained project scheduling problem
    Brucker, P
    Knust, S
    Schoo, A
    Thiele, O
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 272 - 288
  • [42] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [43] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, (05) : 376 - 382
  • [44] Extending the Resource-Constrained Project Scheduling Problem for Disruption Management
    Kuster, Juergen
    Jannach, Dietmar
    INTELLIGENT TECHNIQUES AND TOOLS FOR NOVEL SYSTEM ARCHITECTURES, 2008, 109 : 43 - 61
  • [45] Extending the resource-constrained project scheduling problem for disruption management
    Kuster, Juergen
    Jannach, Dietmar
    2006 3RD INTERNATIONAL IEEE CONFERENCE INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, : 91 - 98
  • [46] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Andrei Horbach
    Annals of Operations Research, 2010, 181 : 89 - 107
  • [47] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [48] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365
  • [49] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [50] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335