The design and construction of the steel hanging box for east cable tower of the Lingdingyang Bridge

被引:0
|
作者
Cai, Yi-Hua [1 ]
Li, Mian [2 ,3 ]
Huo, Dong-Jun [2 ]
机构
[1] Highway Construct Co Ltd, Guangzhou, Guangdong, Peoples R China
[2] CCCC Second Harbor Engn Co LTD, Key Lab Largespan Bridge Construct Technol, Wuhan, Peoples R China
[3] CCCC Highway Bridge Natl Engn Res Ctr Co Ltd, Beijing, Peoples R China
关键词
component; suspension bridge; steel hanging box; back cover concrete; finite element; monitoring; collision impact;
D O I
10.1109/ICHCE57331.2022.10042657
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Lingdingyang Bridge is a three-span steel box girder suspension bridge with a main span of 1666 m on Shenzhen-Zhongshan Link. The main pier cap is 36m in diameter and 8m in height. The double-walled steel hanging box is used as the temporary cofferdam and permanent anti-collision box for the cap. The inner diameter of the steel hanging box is 36.2m, the height is 16m, and the weight is 1783t. During the construction process, the system changes frequently and the stress is complex. A finite element model of the whole construction process is built to analyze the forces during the lifting up, integral lowering, bottom cover pouring and cover pouring. The finite element calculation results are compared with the actual monitoring results on site, and the two are close. At the same time, the MSC. Dytran calculation software was used to simulate the anti-collision effect of the steel gondola when a 100,000 t ship was impacted from the front and side, and it was found that the maximum impact force was reduced by 5.6% and 7.4% respectively during the frontal and side impacts. The structural design of the steel hanging box is reasonable, and the overall calculation method and construction method are reasonable and feasible.
引用
收藏
页码:976 / 982
页数:7
相关论文
共 50 条
  • [41] Mechanical property of cable-pylon anchorage zone of cable-stayed bridge with steel box girder
    School of Highway, Chang'an University, Xi'an 710064, China
    不详
    不详
    Zongguo Gonglu Xuebao, 2007, 4 (48-52):
  • [42] Stress distribution in anchorage zone between beam and cable for cable-stayed bridge with steel box girder
    School of Civil Engineering, Tianjin University, Tianjin 300072, China
    不详
    Harbin Gongye Daxue Xuebao, 2009, 6 (150-154): : 150 - 154
  • [43] Swedish road bridge features airtight steel box design
    Reid, Robert L.
    CIVIL ENGINEERING, 2007, 77 (07): : 22 - 24
  • [44] Research on Mechanical Behavior of Box Girder with Corrugated Steel Webs of Cable Stayed Bridge
    Lv, Liang
    Liang, Bin
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 583 - 586
  • [45] Design of Continuous Steel Box Beam of New Flyover Bridge
    Bai, Quan-An
    Journal of Railway Engineering Society, 2017, 34 (10) : 44 - 49
  • [46] Optimization on Reasonable Construction State for Cable-Stayed Bridge with Steel Box Girder Based on Multi-Objective Programming Algorithm
    He, Junbiao
    Chai, Wenhao
    Hu, Weiming
    Dai, Jie
    Di, Jin
    Qin, Fengjiang
    APPLIED SCIENCES-BASEL, 2025, 15 (01):
  • [47] Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge
    Pei, Bida
    Chong, Aixiu
    Xia, Huan
    Kang, Xueyun
    SCIENTIFIC REPORTS, 2023, 13 (01):
  • [48] Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge
    Bida Pei
    Aixiu Chong
    Huan Xia
    Xueyun Kang
    Scientific Reports, 13 (1)
  • [49] Planning, design and construction aspects of the Suez Canal cable stayed bridge
    Fouad, A
    Bakhoum, MM
    STRAIT CROSSINGS 2001, 2001, : 415 - 422
  • [50] Steel bridge design and construction: a Southern African experience
    Dundu, Morgan
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2015, 168 (04) : 340 - 350