共 50 条
- [41] Mechanical property of cable-pylon anchorage zone of cable-stayed bridge with steel box girder Zongguo Gonglu Xuebao, 2007, 4 (48-52):
- [42] Stress distribution in anchorage zone between beam and cable for cable-stayed bridge with steel box girder Harbin Gongye Daxue Xuebao, 2009, 6 (150-154): : 150 - 154
- [43] Swedish road bridge features airtight steel box design CIVIL ENGINEERING, 2007, 77 (07): : 22 - 24
- [44] Research on Mechanical Behavior of Box Girder with Corrugated Steel Webs of Cable Stayed Bridge ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 583 - 586
- [46] Optimization on Reasonable Construction State for Cable-Stayed Bridge with Steel Box Girder Based on Multi-Objective Programming Algorithm APPLIED SCIENCES-BASEL, 2025, 15 (01):
- [47] Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge SCIENTIFIC REPORTS, 2023, 13 (01):
- [49] Planning, design and construction aspects of the Suez Canal cable stayed bridge STRAIT CROSSINGS 2001, 2001, : 415 - 422