Current Status of MHI's CO2 Recovery Technology and Optimization of CO2 Recovery Plant with a PC Fired Power Plant

被引:27
|
作者
Kishimoto, Shinya [1 ]
Hirata, Takuya [2 ]
Iijima, Masaki [1 ]
Ohishi, Tsuyoshi [1 ]
Higaki, Kazuo [3 ]
Mitchell, Ronald [1 ]
机构
[1] Mitsubishi Heavy Ind Co Ltd, Plant & Transportat Syst Engn & Construct Ctr, Nishi Ku, 3-3-1 Minatomirai, Yokohama, Kanagawa 2208401, Japan
[2] Mitsubishi Heavy Ind Co Ltd, Hiroshima R&D Ctr, Nishi Ku, Hiroshima, Japan
[3] Mitsubishi Heavy Ind Co Ltd, Power Syst Project Engn Dept, Nagasaki, Japan
来源
关键词
CO2; Recovery; PC fired; Power Plant; MHI;
D O I
10.1016/j.egypro.2009.01.144
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
It is the opinion of the authors that CO2 Capture and Storage (CCS) technology can significantly contribute as an effective countermeasure against climate change, allowing us to continue the utilization of fossil fuels for primary energy production. However for this technology to be widely deployed on a commercial basis there are three key issues that need to be addressed; (1) Reduction in energy consumption, (2) Efficient integration with other environmental control equipment of a PC power plant and (3) Reduction in the decrease of net electrical output. MHI has delivered multiple commercial CO2 recovery plants in the chemical and fertilizer industries, which recover CO2 from natural gas fired flue gas, with four commercial plants in operation and another four under construction, all utilizing the proprietary KM-CDR process. In order to gain experience with CO2 recovery from a coal fired flue gas stream, Mitsubishi Heavy Industries (MHI), together with a subsidy from RITE and cooperation from J-POWER, constructed a 10 metric ton per day (T/D) CO2 recovery demonstration plant at the 2 x 500MW Matsushima power station in southern Japan. This demonstration plant has subsequently achieved more than 4,000 hours of successful test operation during 2006 2007 with a further 1,000 hours during 2008, and testing continues today. The demonstration testing confirmed that the KM-CDR process is applicable to coal fired flue gas streams. Future research priorities include the improved integration of the CO2 recovery process with the flue gas pre-treatment components and the additional optimization of removal and separation methods for coal based impurities accumulating in the absorbent. An issue of concern for power plant operators is the reduction of the net electrical output due to the demands of CO2 recovery process. MHI has made significant improvements in this area and in the efficiency of absorbents. However, it is necessary to further reduce the adverse impact on the net electrical output of the power plant via astute integration of the energy transferred between the power plant and the Post Combustion CO2 Capture (PCC) plant. MHI is investigating the following concepts; (1) Utilizing the waste heat of the PCC plant for the power plant, (2) Utilizing heat recovery from the flue gas for the CO2 recovery process and (3) Utilizing the compression heat of the CO2 compressor for the CO2 recovery process. (c) 2008 Elsevier Ltd. All rights reserved
引用
收藏
页码:1091 / 1098
页数:8
相关论文
共 50 条
  • [31] CO2 RECOVERY - REPLY
    MILLER, DB
    [J]. CHEMICAL ENGINEERING PROGRESS, 1987, 83 (05) : 8 - 8
  • [32] Evaluation of power loss for CO2 recovery from flue gas of fossil fuel-fired power plant by chemical absorption method
    Mimura, T
    Satumi, S
    [J]. KAGAKU KOGAKU RONBUNSHU, 1998, 24 (04) : 546 - 551
  • [33] Evaluation of a calcium looping CO2 capture plant retrofit to a coal-fired power plant
    Hanak, Dawid P.
    Biliyok, Chechet
    Anthony, Edward
    Manovic, Vasilije
    [J]. 26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 2115 - 2120
  • [34] CO2 Utilization from "Next Generation" CO2 Enhanced Oil Recovery Technology
    Kuuskraa, Vello A.
    Godec, Michael L.
    Dipietro, Phil
    [J]. GHGT-11, 2013, 37 : 6854 - 6866
  • [35] CIUDEN CCS Project: Status of the CO2 Capture Technology Development Plant in Power Generation
    Lupion, M.
    Diego, R.
    Loubeau, L.
    Navarrete, B.
    [J]. 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 5639 - 5646
  • [36] System optimization of CO2 capture process in an existing power plant
    Xu, Gang
    Ding, Jie
    Yang, Yong-Ping
    Li, Shou-Cheng
    Liu, Wen-Yi
    Song, Xiao-Na
    [J]. Xu, G., 1600, Science Press (35): : 22 - 27
  • [38] Power to methanol technologies via CO2 recovery: CO2 hydrogenation and electrocatalytic routes
    Samiee, Leila
    Gandzha, Sergey
    [J]. REVIEWS IN CHEMICAL ENGINEERING, 2021, 37 (05) : 619 - 641
  • [39] Making deep reductions in CO2 emissions from coal-fired power plant using capture and storage CO2
    Freund, P
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 2003, 217 (A1) : 1 - 7
  • [40] Integration of carbonation process with coal fired power plant to reduce CO2 emissions
    Moazzem, S.
    Rasul, M. G.
    Khan, M. M. K.
    [J]. INTERNATIONAL ENERGY CONGRESS 2012, 2012, 49 : 74 - 82