Treatment of Concurrent Delays and the Prevention Principle in Construction Delay Claims

被引:0
|
作者
Abdul-Malak, Mohamed-Asem [1 ]
El Masri, Carine [2 ]
机构
[1] Amer Univ Beirut, Maroun Semaan Fac Engn & Architecture, Dept Civil & Environm Engn, Construct Engn & Management, Beirut, Lebanon
[2] Amer Univ Beirut, Maroun Semaan Fac Engn & Architecture, Dept Ind Engn & Management, Beirut, Lebanon
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Delays are bound to be experienced on construction projects, and numerous taxonomies have been devised for their classification. Delay-related events that are found to be particularly caused by owners or contractors are likely to give rise to delay concurrency disputes. Another form of difficulty arises when such disputes involve the alleged triggering of the prevention principle in respect of a relevant delay event that is caused by the owner. The paper aims at tackling the treatment of concurrent delays under those conditions that lend themselves to the triggering of the prevention principle. The adopted methodology involved a review of the literature on the types of construction delays and the difficulties associated with their identification and measurement, as well as their patterns of occurrence, including delay concurrency and pacing. It further involved a review of a number of relevant case law on the subject, which allowed a set of lessons learned to be withdrawn. The methods of enquiry that were observed to have been relied upon in deriving resolutions involve the employment of the malmaison approach, the dominant approach, and/or the apportionment approach. The lessons learned are found to have revolved around several critical factors that have been identified to include: the timing at which the events took place, the sequencing with which the events occurred, the level of ambiguity of the contract clauses related to the concerned delay events, and the responsibility for carrying the burden of proving that the relevant events have indeed affected completion.
引用
收藏
页码:1293 / 1301
页数:9
相关论文
共 50 条
  • [31] Choice between fixed and variable delays to reinforcement in the adjusting-delay procedure and concurrent chains
    Grace, RC
    JOURNAL OF EXPERIMENTAL PSYCHOLOGY-ANIMAL BEHAVIOR PROCESSES, 1996, 22 (03): : 362 - 383
  • [32] Documentation and constitution of claims in construction projects caused by delays and changes to the schedule by means of software solutions
    Dokumentation und nachweisführung bei störungen und verzögerungen im bauablauf mit hilfe von softwarelösungen
    Ripberger, A., 2005, VDI Verlag GMBH
  • [33] Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka
    Ekanayake, E. M. K.
    Perera, B. A. K. S.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2016, 6 (05) : 521 - 534
  • [34] Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka
    Karunarathna, Deraniyagalage Chanaka
    Perera, H. A. H. P.
    Perera, B. A. K. S.
    Disaratna, P. A. P. V. D. S.
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [35] Concurrent treatment of safety aspects in ship design and construction process
    Maccari, Alessandro
    TRANSPORT RESEARCH ARENA 2012, 2012, 48 : 95 - 105
  • [36] Construction safety accident prevention research based on 3E principle
    Zhong Xingrun
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 2867 - 2871
  • [37] Efficacy of Dan'e Fukang Soft Extract in Moderate Ovarian Hyperstimulation Syndrome for Concurrent Treatment of Blood and Fluid Guided by the "Triple Prevention" Principle
    Chen, Yan-Hua
    Zhang, Xue-Luo
    Li, Zhong-Yun
    Wang, Xian-Ping
    Wang, Jun
    Zhang, Zhi-Ping
    Zhu, Peng-Fei
    Wu, Xue-Qing
    INTERNATIONAL JOURNAL OF WOMENS HEALTH, 2024, 16 : 385 - 394
  • [38] Delays in the steel construction progress - Legal framework, conflict prevention and conflict resolution.
    Hammacher, Peter
    STAHLBAU, 2015, 84 (01) : 19 - 21
  • [39] An Investigation into the Causes of Payment Delays and Deliberate Delay Tactics in Public Construction Projects in Saudi Arabia
    Bageis, Abdulrahman Salem
    BUILDINGS, 2024, 14 (06)
  • [40] PREVENTION OF POSTOPERATIVE THROMBOEMBOLISM USING A NEW PRINCIPLE OF DRUG TREATMENT
    BUTTERMANN, G
    THEISINGER, W
    OECHSLER, H
    HOR, G
    DEUTSCHE MEDIZINISCHE WOCHENSCHRIFT, 1975, 100 (41) : 2065 - 2069