Treatment of Concurrent Delays and the Prevention Principle in Construction Delay Claims

被引:0
|
作者
Abdul-Malak, Mohamed-Asem [1 ]
El Masri, Carine [2 ]
机构
[1] Amer Univ Beirut, Maroun Semaan Fac Engn & Architecture, Dept Civil & Environm Engn, Construct Engn & Management, Beirut, Lebanon
[2] Amer Univ Beirut, Maroun Semaan Fac Engn & Architecture, Dept Ind Engn & Management, Beirut, Lebanon
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Delays are bound to be experienced on construction projects, and numerous taxonomies have been devised for their classification. Delay-related events that are found to be particularly caused by owners or contractors are likely to give rise to delay concurrency disputes. Another form of difficulty arises when such disputes involve the alleged triggering of the prevention principle in respect of a relevant delay event that is caused by the owner. The paper aims at tackling the treatment of concurrent delays under those conditions that lend themselves to the triggering of the prevention principle. The adopted methodology involved a review of the literature on the types of construction delays and the difficulties associated with their identification and measurement, as well as their patterns of occurrence, including delay concurrency and pacing. It further involved a review of a number of relevant case law on the subject, which allowed a set of lessons learned to be withdrawn. The methods of enquiry that were observed to have been relied upon in deriving resolutions involve the employment of the malmaison approach, the dominant approach, and/or the apportionment approach. The lessons learned are found to have revolved around several critical factors that have been identified to include: the timing at which the events took place, the sequencing with which the events occurred, the level of ambiguity of the contract clauses related to the concerned delay events, and the responsibility for carrying the burden of proving that the relevant events have indeed affected completion.
引用
收藏
页码:1293 / 1301
页数:9
相关论文
共 50 条
  • [21] PREPARED DEFENSE OF DELAY CLAIMS + LEGAL ADVICE FOR CONSTRUCTION DISPUTES
    WULFSBERG, HJ
    ARCHITECTURAL RECORD, 1980, 167 (05) : 73 - 73
  • [22] Delay claims management in construction - a step-by-step approach
    Baki, M.A.
    Cost Engineering (Morgantown, West Virginia), 1999, 41 (10): : 36 - 38
  • [23] Factors influencing decisions on delay claims in construction contracts for Indian scenario
    Chaphalkar, Nitin
    Iyer, K. C.
    CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (01): : 32 - 44
  • [24] Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance
    Antoniou, Fani
    Tsioulpa, Alexandra Vassiliki
    BUILDINGS, 2024, 14 (02)
  • [25] Research on Owner's Claims Based on Construction Project Delay Compensation
    Han, Yifan
    Yan, Ling
    PROCEEDINGS OF 3RD INTERNATIONAL SYMPOSIUM ON SOCIAL SCIENCE (ISSS 2017), 2017, 61 : 489 - 493
  • [26] BIM AIDED INFORMATION AND VISUALIZATION REPOSITORY FOR MANAGING CONSTRUCTION DELAY CLAIMS
    Ali, Babar
    Zahoor, Hafiz
    Aibinu, Ajibade
    Nasir, Abdur Rehman
    Tariq, Ali
    Imran, Umair
    Khan, Rashid Mehmood
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2021, 26 : 1023 - 1040
  • [27] BIM AIDED INFORMATION and VISUALIZATION REPOSITORY for MANAGING CONSTRUCTION DELAY CLAIMS
    Ali B.
    Zahoor H.
    Aibinu A.
    Nasir A.R.
    Tariq A.
    Imran U.
    Khan R.M.
    Journal of Information Technology in Construction, 2021, 26 : 1023 - 1040
  • [30] Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol
    Shahsavand, Parvaneh
    Marefat, Akbar
    Parchamijalal, Majid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (04) : 497 - 533