A new mathematical model for the optimization of block aggregation in open pit mines

被引:3
|
作者
Aalian, Younes [1 ]
Mousavi, Amin [1 ]
Bsiri, Mohammad Hossein [1 ]
机构
[1] Tarbiat Modares Univ, Fac Engn, Tehran 14115111, Iran
关键词
Open-Pit; Production Planning; Clustering; PIL; Heuristics; Integer Programming; Non-Linear Optimization; Algorithm;
D O I
10.1080/25726668.2022.2064260
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The open-pit production planning is one of the most important steps of mine design which becomes a hard and challenging optimization problem in large-scale mineral deposits. A common approach in such a situation is to cluster mining blocks (smallest mining units) into larger units. In this paper, an integer non-linear programming model of the constrained block clustering is developed with the objective of minimizing grade deviations while blocks are geometrically connected within a cluster and the shape and size of individual clusters are in the pre-defined range. Then, a population-based iterated local search algorithm is presented to solve this nonlinear model and find a near-optimum solution. The proposed model and the solution approach were applied to a case study of a gold and silver deposit with 40,947 blocks. The mining blocks are grouped into 1966 clusters which then mine planner can solve production scheduling in less computational time.
引用
收藏
页码:149 / 158
页数:10
相关论文
共 50 条
  • [41] Geopolymer-based modification of blasting sealing materials and optimization of blasting block size in coal seams of open pit mines
    Ding, Xiaohua
    Ao, Zhongchen
    Zhou, Wei
    Qin, Hao
    Yang, Zhongao
    An, Wen
    Li, Xiaoshuang
    Liu, Honglin
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2023, 33 (12) : 1551 - 1562
  • [42] Geopolymer-based modification of blasting sealing materials and optimization of blasting block size in coal seams of open pit mines
    Xiaohua Ding
    Zhongchen Ao
    Wei Zhou
    Hao Qin
    Zhongao Yang
    Wen An
    Xiaoshuang Li
    Honglin Liu
    [J]. International Journal of Mining Science and Technology, 2023, 33 (12) : 1551 - 1562
  • [43] The new Fundamental Tree Algorithm for production scheduling of open pit mines
    Ramazan, Salih
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (02) : 1153 - 1166
  • [44] New approach for selection of waste dump sites in open pit mines
    Hekmat, A.
    Osanloo, M.
    Shirazi, M. Akbarpour
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2008, 117 (01): : 24 - 31
  • [45] A NEW MOVABLE GYRATORY CRUSHER SYSTEM FOR OPEN-PIT MINES
    ALMOND, RM
    [J]. CIM BULLETIN, 1983, 76 (851): : 175 - 176
  • [46] A dynamic-programming based model for phase-mining optimization in open-pit metal mines
    Wang, Qing
    Xu, Xiaochuan
    Gu, Xiaowei
    [J]. ENERGY ENGINEERING AND ENVIRONMENTAL ENGINEERING, PTS 1AND 2, 2013, 316-317 : 896 - 901
  • [47] A new model for the economic impact assessment of large-scale and deep open-pit mines
    Heydari, Mehrnoosh
    Osanloo, Morteza
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023,
  • [48] A new model for the economic impact assessment of large-scale and deep open-pit mines
    Heydari, Mehrnoosh
    Osanloo, Morteza
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (01) : 1 - 26
  • [49] BLOCK CAVING KEEPS SAN MANUEL COMPETITIVE WITH NEIGHBORING OPEN-PIT COPPER MINES
    JACKSON, D
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 1978, 179 (06): : 127 - 136
  • [50] CONTINUOUS CONVEYING IN OPEN PIT MINES.
    Glanz, W.
    Weissflog, J.
    [J]. Bulk Solids Handling, 1982, 2 (01): : 81 - 89