共 50 条
- [3] DYNAMIC-PROGRAMMING IN OPEN-PIT MINING SEQUENCE PLANNING - A CASE-STUDY 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 415 - 422
- [5] DYNAMIC-PROGRAMMING WITH COLOR GRAPHICS SMOOTHING FOR OPEN-PIT DESIGN ON A PERSONAL-COMPUTER INTERNATIONAL JOURNAL OF MINING ENGINEERING, 1985, 3 (01): : 27 - 34
- [6] Mixed integer programming model for short term planning in open-pit mines TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (02): : 101 - 109
- [7] Optimization on Stripping Plan of Outsourced Open-Pit Mines Dongbei Daxue Xuebao/Journal of Northeastern University, 2018, 39 (01): : 123 - 127
- [8] Charging for the waste dumping of open-pit metal mines JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2006, 13 (06): : 481 - 485
- [10] COMPUTER-BASED OPTIMIZATION OF OPEN-PIT MINING SEQUENCES TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1993, 102 : A125 - A133