Lean IT With Value Stream Mapping Analysis: A Case Study in Software Development Life Cycle Process

被引:0
|
作者
Jeong, Bong Keun [1 ]
Ji, Soo-Yeon [2 ]
Jeong, Dong Hyun [3 ]
机构
[1] Coastal Carolina Univ, Dept Management & Decis Sci, Conway, SC 29528 USA
[2] Bowie State Univ, Dept Comp Sci, Bowie, MD USA
[3] Univ Dist Columbia, Dept Comp Sci & Informat Technol, Washington, DC USA
关键词
IT Project Management; Lean Principles; Software Development Life Cycle; Value Stream Mapping; INFORMATION-TECHNOLOGY; TRANSFORMATION; MANAGEMENT; TIME;
D O I
10.4018/IRMJ.291527
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
Value stream mapping (VSM) is a useful tool for depicting the flow of materials and information in manufacturing and service processes. It is known as one of the most popular lean methods to identify bottlenecks, reduce cycle time, and improve current processes. Although VSM has been extensively used in manufacturing, there are limited studies that applied VSM in non-manufacturing environments. In this study, the authors present an application of VSM to improve software development life cycle (SDLC) process in an IT firm. The current process flows (as-is) are mapped to identify non-value-added activities as well as areas for improvement. Based on the analysis of the current state map, the authors propose recommendations, action plans, and a future state map (to-be-process). They estimate that, with the new process changes, IT project delivery time can be reduced from 210.5 days to 137.5 days - a 34.7% reduction in the software development life cycle process. This provides a powerful base for IT project management and enables the IT department to meet its expected project turnaround time.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Application of lean manufacturing using value stream mapping (VSM) in precast component manufacturing: A case study
    Sirajudeen, Rahima Shabeen
    Krishnan, K. Aravind
    [J]. MATERIALS TODAY-PROCEEDINGS, 2022, 65 : 1105 - 1111
  • [32] How Value Stream Mapping Benefits the Lean Supply Chain - A Case Study on Ford Motor Company
    Wee, H. M.
    Wu, Simon
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2008, : 437 - 444
  • [33] A Case Study on Impact of Value Stream Mapping as a Lean Diagnostic Tool on the operational performance of a Medium Enterprise
    Kant, Dave Krishna
    Shrutika, Patil
    [J]. PROCEEDINGS OF THE 2020 FOURTH WORLD CONFERENCE ON SMART TRENDS IN SYSTEMS, SECURITY AND SUSTAINABILITY (WORLDS4 2020), 2020, : 47 - 52
  • [34] Lean construction analysis of concrete pouring process using value stream mapping and Arena based simulation model
    Zahraee, Seyed Mojib
    Esrafilian, Rasoul
    Kardan, Ramtin
    Shiwakoti, Nirajan
    Stasinopoulos, Peter
    [J]. MATERIALS TODAY-PROCEEDINGS, 2021, 42 : 1279 - 1286
  • [35] Integrating Lean Six Sigma with life cycle and value stream level of RAMI 4.0
    Ozkan-Ozen, Yesim Deniz
    Garza-Reyes, Jose Arturo
    Kazancoglu, Yigit
    [J]. QUALITY MANAGEMENT JOURNAL, 2024,
  • [36] Value Stream Mapping: Effective Lean Tool for SMEs
    Narke, Mahadeo M.
    Jayadeva, C. T.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2020, 24 : 1263 - 1272
  • [37] Value stream mapping as a lean tool in hospital setting
    Department of Management, University of Prishtina Hasan Prishtina, Prishtine
    10000, Serbia
    不详
    10000, Serbia
    [J]. J Qual., 2021, 3 (149-170):
  • [38] Application of lean in construction using value stream mapping
    Ramani, Prasanna Venkatesan
    Lingan, Laxmana Kumara K. S. D.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 216 - 228
  • [39] An application of simulation and value stream mapping in lean manufacturing
    Lian, YH
    Van Landeghem, H
    [J]. SIMULATION IN INDUSTRY, 2002, : 300 - 307
  • [40] Lean Manufacturing Machine using Value Stream Mapping
    Wicaksono, Soetam Rizky
    Setiawan, Rudy
    Purnomo
    [J]. 1ST INTERNATIONAL CONFERENCE ON ADVANCE AND SCIENTIFIC INNOVATION, 2019, 1175