Lean construction analysis of concrete pouring process using value stream mapping and Arena based simulation model

被引:13
|
作者
Zahraee, Seyed Mojib [1 ]
Esrafilian, Rasoul [2 ]
Kardan, Ramtin [3 ]
Shiwakoti, Nirajan [1 ]
Stasinopoulos, Peter [1 ]
机构
[1] RMIT Univ, Sch Engn, Dept Mfg Mat & Mechatron, Melbourne, Vic 3053, Australia
[2] Concordia Univ, Concordia Inst Informat Syst Engn CIISE, Montreal, PQ, Canada
[3] Univ North Dakota, Coll Engn & Mines, Grand Forks, ND 58202 USA
关键词
Lean construction; Concrete pouring process; Value stream mapping; Computer simulation; Waste; INDUSTRY; WASTE; MANAGEMENT; DESIGN;
D O I
10.1016/j.matpr.2020.12.955
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An important challenge for the construction industry is how to reduce non-value adding activities which produce waste. Many researchers have attempted to resolve it to enhance the performance of this industry. However, the concrete pouring process (CPP) has not been adequately investigated in this regard. Accordingly, the present study aims to examine how to apply the lean manufacturing concepts to CPP effectively determine different wastes generated during operations, the main cause of the waste generation, and the strategies to minimize or mitigate the generation of the waste. Mixed value stream mapping (VSM) and computer simulation are applied to identify and eliminate wastes in a CPP case study by using lean principles and time-frame formulation through takt time calculation. Based on the future VSM improvements, findings showed that that production lead time (PLT) reduced from 11 days to 7 days, and the value-added time decreased from 38.2 min to 22.5 min. Takt time also was reduced from 138 s to 93 s. Our results are a valuable resource for construction managers and engineers to improve the concrete pouring process's productivity in a cost-effective and timely manner. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1279 / 1286
页数:8
相关论文
共 50 条
  • [1] Development of Lean Model for House Construction Using Value Stream Mapping
    Yu, Haitao
    Tweed, Tarry
    Al-Hussein, Mohamed
    Nasseri, Reza
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (08) : 782 - 790
  • [2] Application of lean in construction using value stream mapping
    Ramani, Prasanna Venkatesan
    Lingan, Laxmana Kumara K. S. D.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 216 - 228
  • [3] Lean manufacturing analysis of a Heater industry based on value stream mapping and computer simulation
    Zahraee, Seyed Mojib
    Tolooie, Ali
    Abrishami, Salman Jameh
    Shiwakoti, Nirajan
    Stasinopoulos, Peter
    [J]. 30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1379 - 1386
  • [4] Visualizing lean effects with simulation-based value stream mapping
    Lian, YH
    Van Landeghern, H
    [J]. ISC'2005: 3RD INDUSTRIAL SIMULATION CONFERENCE 2005, 2005, : 168 - 172
  • [5] An application of simulation and value stream mapping in lean manufacturing
    Lian, YH
    Van Landeghem, H
    [J]. SIMULATION IN INDUSTRY, 2002, : 300 - 307
  • [6] Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
    Lian, Y.-H.
    van Landeghem, H.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (13) : 3037 - 3058
  • [7] Concrete Slab Value Stream Mapping of Brazilian Residential Buildings - A Lean Construction Study Case
    Pucharelli Fontanini, Patricia Stella
    Milano, Caroline de Souza
    Fujimoto, Aparecido
    Cecche Lintz, Rosa Cristina
    Gachet-Barbosa, Luisa Andreia
    Jacintho, Ana Elisabete P. G. A.
    Pimentel, Lia Lorena
    [J]. MATERIAL DESIGN, PROCESSING AND APPLICATIONS, PARTS 1-4, 2013, 690-693 : 829 - +
  • [8] LEAN DISTRIBUTION ASSESSMENT USING AN INTEGRATED FRAMEWORK OF VALUE STREAM MAPPING AND SIMULATION
    Mahfouz, Amr
    Arisha, Amr
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3440 - +
  • [9] Value Stream Mapping and Simulation in a Construction Company
    Tam, Yeen Shin
    Wong, Kuan Yew
    [J]. INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015, 2015, : 297 - 308
  • [10] A Lean Manufacturing Procedure using Value Stream Mapping and the Analytic Hierarchy Process
    Dotoli, Mariagrazia
    Fanti, Maria Pia
    Rotunno, Giuliana
    Ukovich, Walter
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 1193 - 1198