Value Stream Mapping and Simulation in a Construction Company

被引:0
|
作者
Tam, Yeen Shin [1 ]
Wong, Kuan Yew [1 ]
机构
[1] Univ Teknol Malaysia, Fac Mech Engn, Utm Skudai 81310, Johor, Malaysia
关键词
Kanban; lean manufacturing; simulation; value stream mapping; Witness;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Lean manufacturing tools have been applied in a construction company in Malaysia. This project aims to identify the problems of the operations by using Value Stream Mapping and develop alternatives for improvement. Based on the current state value stream map, the Value Added (VA) ratio of the production is 0.43. The analysis shows that the most critical problem is the high queue time between QC inspection and primer coat painting due to unbalanced processes. Basic Kanban, CONWIP and Hybrid Kanban/CONWIP have been suggested and evaluated using the Witness simulation software. The simulation results indicate that Hybrid Kanban/CONWIP is the most suitable alternative. Based on the future state value stream map, the VA ratio has gained 11.63% to 0.48, indicating that Hybrid Kanban/CONWIP could effectively reduce the high queue time between QC inspection and primer coat painting.
引用
收藏
页码:297 / 308
页数:12
相关论文
共 50 条
  • [1] Value stream mapping and lean simulation: a case study in automotive company
    P. F. Andrade
    V. G. Pereira
    E. G. Del Conte
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 85 : 547 - 555
  • [2] Value stream mapping and lean simulation: a case study in automotive company
    Andrade, P. F.
    Pereira, V. G.
    Del Conte, E. G.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (1-4): : 547 - 555
  • [3] Sustainable Growth of a Company by Means of Value Stream Mapping
    Jac, Ivan
    Sedlar, Josef
    [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON LIBEREC ECONOMIC FORUM 2013, 2013, : 222 - 230
  • [4] CONCEPTS FOR SIMULATION BASED VALUE STREAM MAPPING
    Solding, Petter
    Gullander, Per
    [J]. PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2172 - +
  • [5] SIMULATION OF COST DRIVEN VALUE STREAM MAPPING
    Jordan, E.
    Berlec, T.
    Rihar, L.
    Kusar, J.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (03) : 458 - 469
  • [6] Application of lean in construction using value stream mapping
    Ramani, Prasanna Venkatesan
    Lingan, Laxmana Kumara K. S. D.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 216 - 228
  • [7] Modelling and Simulation the Value Stream Mapping - Case Study
    Pekarcikova, Miriam
    Trebuna, Peter
    Klimenti, Marek
    Kral, Stefan
    Dic, Michal
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2021, 12 (02) : 107 - 114
  • [8] Simulation of production process reorganized with value stream mapping
    Gjeldum, Nikola
    Veža, Ivica
    Bilić, Boženko
    [J]. Tehnicki Vjesnik, 2011, 18 (03): : 341 - 347
  • [9] SIMULATION OF PRODUCTION PROCESS REORGANIZED WITH VALUE STREAM MAPPING
    Gjeldum, Nikola
    Veza, Ivica
    Bilic, Bozenko
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (03): : 341 - 347
  • [10] An application of simulation and value stream mapping in lean manufacturing
    Lian, YH
    Van Landeghem, H
    [J]. SIMULATION IN INDUSTRY, 2002, : 300 - 307